  1. #176
    Member
    Join Date
    Sep 2007
    Last Online
    26-05-2024 @ 02:55 PM
    Location
    Ubon Ratchathani
    Posts
    432
    ^ no they are not thinkers, they just do as they are told by the boss. The trouble is that he forgets things ! Probably because he is so busy, too many projects on the go at once. he forgot to tell them about the bathroom stuff, and they are not going to do something on their own initiative, that's not the Thai way. They are just labourers. Did they go to a trade school ? no probably not but that's not unusual in Thailand, is it ? I've got no problem with the quality of what these guys are doing, just with the boss not supervising properly.

    We are out at the site every morning, and back again in the evening. That's how we picked up this error in the bathroom.

  2. #177
    Thailand Expat helge's Avatar
    Join Date
    May 2008
    Last Online
    @
    Posts
    12,235
    Quote Originally Posted by mikenot View Post
    he forgot to tell them about the bathroom stuff, and they are not going to do something on their own initiative, that's not the Thai way. They are just labourers.
    Thais I know, are better with a phone than me. You and I would call the Boss, if there was any "dark spots".
    Quote Originally Posted by mikenot View Post
    Did they go to a trade school ? no probably not but that's not unusual in Thailand, is it ?
    No

    Was actually my point
    Quote Originally Posted by mikenot View Post
    I've got no problem with the quality of what these guys are doing
    Then everything will be OK; maybe a little late, but OK

  3. #178
    Member
    Join Date
    Sep 2007
    Last Online
    26-05-2024 @ 02:55 PM
    Location
    Ubon Ratchathani
    Posts
    432
    Haven't been able to get on here for a few days, but nothing much happening on-site lately. The electrician has been here a few times, he reckons they are waiting for the ceiling guys to finish and clear out so that the painting and tiling can start. "Hmmm...they have finished the outbuilding so why not start there ?"
    anyway by yesterday afternoon all the interior ceiling was done, just a few more boards to put up outside under the side verandah roof.
    A "not so Grand Design" in Ubon Ratchathani-20240523_160426-jpg

    It seems there was a lack of communication between sparky and ceiling crew, the wires for down lights in bedroom did not get pulled through so now he has to climb up in the roof space to access them. Lucky he is skinny because those manholes in the ceiling are not very wide. Are we allowed to call them manholes now?...access holes for people of non specific gender.
    The builder tried to talk the wife into using some special decorative wavy ceiling boards outside, at an extra cost of course, saying that otherwise there would be mould in a couple of years. Not if you use the special "green" boards for damp/humid areas matey!
    A "not so Grand Design" in Ubon Ratchathani-20240523_160451-jpg

    A front view of the house, doing the last little fiddly bits of ceiling:
    A "not so Grand Design" in Ubon Ratchathani-20240523_160548-jpg

    May not have been much progress inside the house but I have been busy in the back garden, turning dirt into soil. Any gardeners among you may have heard of "lasagna garden beds", for people who haven't it is where you lay down a layer of cardboard, then various organic matter in layers. The cardboard smothers any grass or weeds, then the grass clippings, leaves, manure, vegetable scraps etc decompose over a few months to form a good dark soil, a great improvement on the usual Issaan dirt.
    The wife scoffed at me, she would just throw chemical fertilizers at it, but she is starting to change her tune.
    start with the cardboard from the bathroom tiles:
    A "not so Grand Design" in Ubon Ratchathani-img_8126-jpg

    Add some green matter:
    A "not so Grand Design" in Ubon Ratchathani-img_8127-jpg

    Then some brown:
    A "not so Grand Design" in Ubon Ratchathani-img_8129-jpg

    Wet each layer thoroughly, and keep repeating:
    A "not so Grand Design" in Ubon Ratchathani-img_8121-jpg

    Leave it for a few months, for the wet season will be fine, and you should end up with something like this :
    A "not so Grand Design" in Ubon Ratchathani-img_8119-jpg

    Dark, soft and full of organic matter, that's one I started a couple of months ago and still has a way to go, but already much better than the original dirt:
    A "not so Grand Design" in Ubon Ratchathani-img_8122-jpg

    That's 3 small "lasagna" beds and one large one done, perhaps another 3 small or one long one to go. Not much I can do about the front garden yet until the builders have finished.
    Last edited by mikenot; 24-05-2024 at 04:01 PM.

  4. #179
    Thailand Expat helge's Avatar
    Join Date
    May 2008
    Last Online
    @
    Posts
    12,235
    Quote Originally Posted by mikenot View Post
    The builder tried to talk the wife into using some special decorative wavy ceiling boards outside, at an extra cost of course, saying that otherwise there would be mould in a couple of years. Not if you use the special "green" boards for damp/humid areas matey!
    And why won't mould grow on "special green boards for damp and humid areas" ?

    Just curious...matey


Page 8 of 8 FirstFirst 12345678

Thread Information

Users Browsing this Thread

There are currently 12 users browsing this thread. (0 members and 12 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •