Quote Originally Posted by sunsetter View Post
lovin it mate, floors looks pukka, not far to go, hows the pool coming along?
Khun Sun, Thanks for the nice comments. Not sure what a "pukka" is but I'll assume it isn't all bad...

Pool construction is temperarily suspended. The pool itself is complete minus the tile and concrete finishing. The surge/balance tank has been started and is near completion but I do not want it tiled to far before the house is completed and I'll wait for 2 months or so until I have a better feel for when I'll be back in country. The tile and pump/filter equipment will be ordered soon but I have purchased some Jandy Never Lube Valves that were suggested to me by a former TD member (I have not seen him participating in the last 3 months or so), and will either hand carry them my self when I come over or if I can identify someone who is going that way soon and is interested in hand carrying them for me, I might be in business.

Anyway, The pump house is started and will be completed in 2 weeks and all is good. The internal friction within the pool company that is seperate from Khun my house contractor has caused some minor irritation in that it makes it more difficult for me to do the coordination I want to do but in the end, the technical end of the pool construction seems to be top notch. Khun has been nice enough to keep an eye out on this for me as well. The end will tell.