Results 1 to 25 of 74

Hybrid View

  1. #1
    Member
    neilandmeechai's Avatar
    Join Date
    Jan 2011
    Last Online
    01-08-2017 @ 08:53 AM
    Location
    Angsila Chonburi Thailand
    Posts
    465

    The ground floor extension is looking good ...



    The ground floor extension is laid and nearly dry ...




    It's starting to look better now ...
    It cost's nothing to be nice!

  2. #2
    Member
    neilandmeechai's Avatar
    Join Date
    Jan 2011
    Last Online
    01-08-2017 @ 08:53 AM
    Location
    Angsila Chonburi Thailand
    Posts
    465

    Wooden Scaffolding supports 1000's of kilos of concrete



    Still the old porch and the old balcony can be seen through the new building.


    I can always use it to grow some climbing plants on ...


    View from the old top balcony.



  3. #3
    Member
    neilandmeechai's Avatar
    Join Date
    Jan 2011
    Last Online
    01-08-2017 @ 08:53 AM
    Location
    Angsila Chonburi Thailand
    Posts
    465

    You don't need new wood every time ...

    The finished extension was built within centimetre tolerances and all with old pieces of wood .... Amazing !







  4. #4
    Member
    neilandmeechai's Avatar
    Join Date
    Jan 2011
    Last Online
    01-08-2017 @ 08:53 AM
    Location
    Angsila Chonburi Thailand
    Posts
    465

    I wonder if anyone is out there?

    Just a short interlude before I upload some more photo's.
    I am very new to "Blogs" and only joined TeakDoor a few days ago. It is all very new, how to, and if I am doing it correctly? I also hope that if someone calls along this page (thread?) and takes a look at what we have been doing that they would also just say hello?
    From what I have seen on TeakDoor I can learn a lot and I am sure this forum will be very helpful.

  5. #5
    Member
    neilandmeechai's Avatar
    Join Date
    Jan 2011
    Last Online
    01-08-2017 @ 08:53 AM
    Location
    Angsila Chonburi Thailand
    Posts
    465

    Just a few more days ...








  6. #6
    Member
    neilandmeechai's Avatar
    Join Date
    Jan 2011
    Last Online
    01-08-2017 @ 08:53 AM
    Location
    Angsila Chonburi Thailand
    Posts
    465

    Nearly ready for painting ...

    Breaking down the original balcony railing


    All the electrics were placed in conduit ready for the ceiling fan, sound system and lighting.


    The original front porch railing bites the dust ...


    Insulated double garden sockets were installed in both front pillars.

  7. #7
    Member
    neilandmeechai's Avatar
    Join Date
    Jan 2011
    Last Online
    01-08-2017 @ 08:53 AM
    Location
    Angsila Chonburi Thailand
    Posts
    465

    Sun terrace and Shaded terrace nearly ready ...

    Rendering the outside ready for painting


    Building up the new step to the shaded terrace area.


    Tiles are laid on the new Sun terrace


    Now looking a lot larger our new shaded terrace is nearly ready

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •