This is a dead tree by the largest fish tank. I plan to get it in the house, six metres of it, as a stand for orchids.
Detail.
![]()
nice idea OM,coming along a treat, any idea of a finish date? before the rainy season maybe?
With time, and experience, I've learned not to put a deadline on a construction. It never happens as you saw it and it put stress on the whole trip.
We'll see.
I have a bed to sleep in... It never rains...
Cement work is almost finished, maybe another week. Paint, floors to finish, bathroom and tiles...
Then wood doors and windows. This will be very long, never know a finish date. My contractor has never built shojis.
I hope to swim in the hot water of the natural swimming pool during the hotter months of April and May, but this is not a condition of happiness for me.
Que sera sera.
And here I was, all surprised by their creativity, and it was simply fallen mortar!
I requested that they undid the fixing and let it go back to the masterpeace I think it was.
Starting to prepare floors for tiles, leveling and one more step towards finition.
![]()
From the bedroom, walk-in and bathroom, rendered.
![]()
Here are some views of the house, before white color painting.
South side.
South-Eastern corner.
![]()
Floors are now ready for tiles, pipes and wires have dissappeared.
The wood boards sava a space for sliding shojis.
Kitchen counter ready for tiles.
I could not find the kind of counter top I had imagined at Global, thick arborite. So I'm going to get large tiles, next trip...
Like magic, the art detail reappeared...
![]()
The ground floor wndow is now framed. It will have a circle in the square.
The front face is shaping up.
![]()
I've stopped the belt road building a bit before completion, the budget is gone...
But most of it is done, 93%, with the waterway wider and deeper.
![]()
OM:
It's coming along nicely, I too like the "mortar" detail, glad you had them "fix" it back. I think the road with the increased waterway will work out fine. May need some fine tuning but the next rainy season will show exactly where and what.
Keep up the great work, Rome wasn't built in a day so why rush a good looking project and screw up the finishing. Happy swimming!
Jim
Thank you, Jim.
One day, maybe, you'll see the project completed. I was going to say "finished" but this means that I drop it and go somewhere else... No, completed, rather, one day, that's better...
Post #610Originally Posted by Old Monkey
Looks like a fabulous view over the fields from the window.
Garage door installed.
The painting of walls start today, feb 10.
One section of wall had to be put down, re-building around the door frame.
![]()
First coat of paint. This gives you an idea of the final look.
![]()
First row of tiles on the sidewalk, almost all around the second floor.
Note : no grout.
![]()
Painters painting!
![]()
Second sidewalk. South side.
![]()
Pouring the top of the wide kitchen counter.
A hole for the sink.
![]()
2nd coat of white paint, living
Office
Bedroom
![]()
Early this morning, I had to decide where to put the bathtub, I had gotten one, a bit big. I did not quite fit where I thought it was going.
So, I put the decision to my wife, in Quebec. I took pictures of 3 possible spots.
![]()