They had to rip up a fair bit of the old concrete before they got started
There was also a section of my drive in the soi that i thought might as well get fixed while we were fuckin about
Heres the materials, 450 000 kip for a small truck of sand and about the same for the river rock
I couldnt park the car in my drive for about a week while it cured but the neighbours were away so we parked there instead
weve left a bit of room for the tree to grow and a nice little flower feature will soon be getting installed
I reckon it came up quite well, not sure why the kids are trying to shoot the dog though
This time when they quoted me on the job i got them to include getting rid of the crap when they finish, usually they leave it to you,
All that remains to be done now is get that barbecue out of the box and fire it up
Next job is a courtyard roof replacement, the guys doing that say they can start in a couple of weeks, good stuff im wanting to get it done before the wet











Reply With Quote