"I think what you are seeing as cracks is where thay have chipped out to put conduit and refilled"

Sorry I haven't figured out the quote feature here. The above quote was from page 2 or so.

I first saw this "build a wall and come back later to chip out space for conduit and plumbing" type of work when I was in in Abu Dhabi years ago. I asked them about it and they looked at me like I had carrots growing out of my ears.

Think about it.......you just made a CEMENT frickin' WALL, and now you are attacking it because?

Why not lay all the plumbing and electrical conduit uprights first?

Then build the fecking cement wall over/on top of them?

OK........IF there is a problem with the plumbing 20 years from now, then that is the time to attack the cement, no?

It's like pouring all the cement for a pool and then digging it up to install the plumbing.

I guess the "P" in Thailand stands for "Planning".

Not flaming anybody, but I just don't get this idea overall.

Cheers,
Jay