Internal walls
Walls forming the room dividers, etc. followed those from the zone1/2 build. 100mm AAC Blockwork which was then plastered and painted.
(The pictures are a little 'out of sequence' because i have broken the posts down into building sections rather than in chronological order)
Views looking into bedroom 3. Strictly speaking these are external walls (150mm block).
The rendering work commences...
Inside bedroom 4
Inside bedroom 3
Looking across from gym into the cinema / media room
Fixing the Shower-room tiles
Gym wall finished and waiting for the sliding doors