Results 1 to 25 of 3103

Hybrid View

  1. #1
    Days Work Done! Norton's Avatar
    Join Date
    Oct 2007
    Last Online
    Today @ 02:23 PM
    Location
    Roiet
    Posts
    35,391
    Quote Originally Posted by Thai Dhupp
    How many showers / sinks is it servicing?
    Kitchen, 3 showers, washing machine and a bath tub.

    Quote Originally Posted by Thai Dhupp
    do you ever run out of hot water?
    Not yet with 100 litre. Daily use by 4. Larger boilers avalable if your usage more. Boiler located in storeroom. Upvc hot water pipe to all mixers. Plus for me is not having electrics hanging off the wall right next to where you're standing in water.

    Your call but I'd go with the boiler first and after you get your garden in and have a good sunny spot for a ground mounted solar heater simply run hot water into the boiler.

  2. #2
    Freelance Astronaut
    Thai Dhupp's Avatar
    Join Date
    Sep 2016
    Last Online
    20-03-2025 @ 11:58 PM
    Location
    Thailand...just Thailand!
    Posts
    2,103
    Quote Originally Posted by Norton View Post
    Quote Originally Posted by Thai Dhupp
    How many showers / sinks is it servicing?
    Kitchen, 3 showers, washing machine and a bath tub.

    Quote Originally Posted by Thai Dhupp
    do you ever run out of hot water?
    Not yet with 100 litre. Daily use by 4. Larger boilers avalable if your usage more. Boiler located in storeroom. Upvc hot water pipe to all mixers. Plus for me is not having electrics hanging off the wall right next to where you're standing in water.

    Your call but I'd go with the boiler first and after you get your garden in and have a good sunny spot for a ground mounted solar heater simply run hot water into the boiler.
    A daily bath can use 80-100 litres! I bet that 2-seat jacuzzi bath i looked at yesterday in Global House used more! so maybe if going with the central boiler it would need to be uprated. Like I said, the boiler option for the master 'wing', office and maybe the kitchen requirements too (there is possibility for such sharing, as the kitchen is below the master wing) and individual water heaters for the other rooms

    The boiler might not be the option for the whole house as it would be long pipe runs to feed the other 2 bedrooms in the other 'wing' (building 3)

Thread Information

Users Browsing this Thread

There are currently 2 users browsing this thread. (0 members and 2 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •