Quote Originally Posted by bsnub View Post
Keystone jobs were only going to be 4-8 months long and the negatives in the long run far out weigh the positives.




5 Reasons Why the Keystone Pipeline is Bad for the Economy - Labor Network for Sustainability

The negatives such as transporting oil by truck and railway?