OK, we spent a long day out at the house site.
Inspecting some of the concrete walls, I discovered things were not all lining up with the frame nice & flush. I was told that the house frame is not truly straight. Needless to say, I'm a little peturbed and will be bringing this up with PD House.
But block work goes on. Most of the upstairs is 80% complete. They are now staring the ground floor.
So here are some more shots of the work.
Upstairs looking south-east from the master bedroom:
From the other side looking back at the master bedroom:
This is a different perspective from what I normally show. I walked down the road and shot across the rice paddy.
A shot looking through some of the trees we planted almost 2 years ago:
This is from what will be the driveway:
And a view of the work crew, on the ground floor:
And the work continues...