Sand was filled into the floor area and water sprayed over it all day. The metal bars coming out of the floor perimeter are to hold a concrete footpath, all around, against the shed.
Last week my wife and I selected roofing tiles from a local shop. We compared prices in several shops, explaining exactly what we needed and asking about availability. The builder gave us a list so there would be no miscommunication (ha)! One store had the style and color we wanted, but only 200 flat tiles (we require 385, and another 50 odd shaped). The lady insisted they would be shipped up from Bangkok within 10 days. We politely declined, as we need them by Monday. A few minutes later, at the next store, we ordered what we needed for delivery Monday.
Today (Sunday) a truck pulled up in front loaded with tiles -- a day early! We told the driver to unload them next to the shed. After he went back for the second truckload, my wife and I went out to look at them. They weren't what we ordered, so wifey calls the roof shop -- the lady said the order will be delivered tomorrow as scheduled and had no idea where today's delivery was coming from.
You guessed it -- from the first shop. Told the driver to take back the second load and then return for the first, cheeky bastards.