    Ok, I'm stupid...what do you mean by "rendering", is it putting the top coat of plaster/concrete on the walls?

  2. #152
    Thailand Expat
    malmomike77's Avatar
    Join Date
    Aug 2021
    Last Online
    @
    Posts
    13,982
    ^ usually yes

  3. #153
    Member
    Join Date
    Sep 2007
    Last Online
    Today @ 02:26 PM
    Location
    Ubon Ratchathani
    Posts
    419
    Quote Originally Posted by Topper View Post
    Ok, I'm stupid...what do you mean by "rendering", is it putting the top coat of plaster/concrete on the walls?
    rendering = plastering. Applying either a sand and cement mix over brick walls, or using a special pre-made mix for AAC blocks as we have.
    Such as this stuff:
    A "not so Grand Design" in Ubon Ratchathani-renderrmix-jpeg

    I think the americans call it "stucco" ?

  4. #154
    Thailand Expat
    katie23's Avatar
    Join Date
    Jan 2014
    Last Online
    @
    Location
    PI
    Posts
    6,718
    ^I think stucco refers to a certain type of finish, from what I understand how it's done here in PH. You can choose not to paint over a stucco-finish wall. (from what I've seen in projects here)

    Rendering = plastering = "palitada" in Tagalog (for Topper)

    From what I've seen here in PH, after the wall has been made using CHB, they render it using a cement-sand mixture. Then if not skimping on money, they apply a skim coat before painting with primer. (If low budget, sometimes they skip the skim coat.) They apply 2 coats of primer then the top coat.

    @mike - I hear you re: choosing tiles & whatnot. I've been to a Wilcon Depot (large depot here) and there are so many tiles, paints, bathroom fixtures etc to choose from! I wasn't doing a house build then but the depot was near an office that I visited, so I made the detour. I've taken pics of the tiles & paints that I fancied. Lol.

    Thanks for the updates!

  5. #155
    Member

    Join Date
    Sep 2015
    Last Online
    Today @ 08:38 AM
    Location
    Ayong, Surin
    Posts
    338
    Quote Originally Posted by mikenot View Post
    Never again will I subject myself to that trauma.
    I'm hearing you Mike. Loud and clear. Compared with the rest of the fit-out, tile selection stands alone as an item that still causes my blood pressure to rise. Never again.
    At least 10 trips to Do Home, Home Pro, Global House and various tile stores in and around Surin, including a trip to Prassat.
    Then there was getting stock from other stores as Do Home Surin didn't have enough in stock for the tiles we selected. Luckily they were able to scrape together enough to fill our order.
    All in all very energy draining. Fortunately we had a master tiler. He and his wife are an excellent team, and made up for all the hassle in selecting the various tile combinations.
    We ended up with a great result; the best part of the build.

    I like your stove and range hood selection using your experience. Wish I had a similar level of knowledge. SWMBO took charge of ours, so I'm not sure what our range hood will be like once it starts getting used.
    We opted for an induction stove rather than gas. Still not sure whether it will prove to be a success as it hasn't been used yet, 8 months on....

  6. #156
    Thailand Expat DrWilly's Avatar
    Join Date
    Dec 2021
    Last Online
    @
    Posts
    11,906
    Great updates!

  7. #157
    Member
    Join Date
    Sep 2007
    Last Online
    Today @ 02:26 PM
    Location
    Ubon Ratchathani
    Posts
    419
    Progress report for the last week or so :

    The people doing the decorative mouldings have been irregular visitors. As mentioned before they turned up a week ago while the regular crew was pouring the concrete apron around the house, took the next day off before returning for a bit more work and then disappearing again. 2 days ago they got about 2 thirds of their work done then told the wife they needed an advance of 10,000 baht to buy supplies. This is one of the "extras" not included in the builder's price. After sending them the money we have not seen them again, causing the wife a bit of worry. so she talked to the builder who said they are reliable, and are regular sub-contractors for him, don't fret...we will see.
    The ceilings are under way, all the hangers and framework for the house ceiling has been completed but we haven't seen them for a couple of days either. Still got the verandahs and outbuilding to do though.
    A "not so Grand Design" in Ubon Ratchathani-img_8069-jpg

    All the electrical wiring in the house is in place I think as we have not seen the sparky for a couple of days either.
    Do they have some secret method of knowing what wire leads where, or will it be trial and error when it comes to connecting circuit breakers and switches ?
    A "not so Grand Design" in Ubon Ratchathani-img_8084-jpg

    But looking at that more closely I can see a couple of unused conduits so perhaps he has not finished yet?

    The tiles have been delivered and one of the crew told the wife tiling would start on Monday (yesterday) but no, nothing happening there. I guess they cannot start on the floor tiles until all the scaffolding is gone from inside, which means we are being delayed by missing workers. He has another job not far from our rental house so we see all the workers coming and going to that job ! There is a 180 day deadline for completion in the contract, and we are up to almost 4 months now. I think tiling and painting is going to take up a lot of the remaining 2 months or so so Khun Ae had better get his workers organised. Personally I am not that worried if it goes over schedule as we have a roof over our heads now, and I would rather have a good job done than a rushed one. The wife is not so forgiving though, and she had quite a "discussion" with the builder this afternoon when we were out at the site.
    "Why only 2 people painting the cladding and many people at other job?"
    "Look at all these chips in the walls " (where people have knocked scaffolding and ladders against the walls)
    The "bua people" have vanished
    "The drains are full of sand and rubbish" (because nobody put the lids over the inspection holes)
    Blah, blah, blah.....
    She was not a happy camper.
    I'm expecting a larger work crew tomorrow

Page 7 of 7 FirstFirst 1234567

Thread Information

Users Browsing this Thread

There are currently 6 users browsing this thread. (0 members and 6 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •