Arrived on site to the sound of drilling, not wood, but concrete, prolonged bursts of hammer action chiselling, and wondered what the heck was going on...
Some floor tiles were being taken up as they weren't laid flat enough.. I didn't think they were too bad, nothing that would have resulted in stubbed toes and any raised edges would be worn down soon enough as terracotta isn't the toughest flooring in the world (I 'd invite people with tough feet to walk to the fridge and back to get beers).
Additionally, the Bifold doors were all being taken off and fettled, bolts being re-positioned etc.
So, the things I ask for get interpreted into the next best thing, and yet stuff I don't ask for gets done.. at this stage I have adopted a bit of a not-giving-a-hoot attitude, as things tend to work themselves out after a few days anyhow. Overall I'm pretty happy.
Other stuff:
The thrones and other bathroom bits have arrived
Tiling going on the verandah:
And a meeting in what will be the kitchen, with the kitchen design and installation crew, the missus and Noarn the build:
Lots of chat, questions, answers, more of the same questions, followed by the same answers. Basically, the upshot of it was that the electrician had installed the wiring in the wrong places. Oh... really?!
Trenches were also being dug for the water supply pipes, external security lights, more internal lights, bathroom fans, showers and some more plug sockets are now also installed... so lots of activity today.