Hello group,
In order to access my land plot I need cross a public concrete water channel that runs through my property some 30 meters from the road. It is a public waterway that supplies water for agriculture all year round from a nearby water reservoir.
The water channel is at ALMOST ground level on one side of the land (near the bananas trees) and raises to a bridge of almost 2 meters high as the land goes downhill.
Crossing under it is possible only for small vehicles up to 2 meters high,
In order to cross over the aqueduct, i will need to fill up an access road ( just till the bananas trees in the following picture)
the fill up will be 10m wide x 40m long x 1.5m high and will slope down nicely.
creating a road that crosses the channel and turns left between the bananas trees and the big tree in this picture joining the road that crossed under the aqueduct and continuing straight for the entire length of the plot (400m)
obviously i don't want to damage the water supply to my neighbors, so any advise on how to approach the crossover construction will be valuable.
what would you do in this case?