Building a house in Nakon Ratchasima province(Isaan)
So here we go,i will upload pictures from the house and tell whats happening or whats history already....i have to get familiar with this site first......where to upload picture etc.....cheers....
(where do i upload pictures from the harddrive-USB stick??)any help around?thanks..
Internet connection......and building with PD
its fair bit of luck here with decent internet,which means i dont have a good connection all the time downstairs,despite my little aerial plugged in......but its much better than in the 1.floor(my wife's parents place)its too hot up there...(the connection is better up there btw...)
got a ceiling fan outside here and can have a beer after work.....and chill out......
my 1. post was in "Stevefarang" thread.....and whoever wants to built with PD,its worth reading "builing a house in Nakom Pathom" too....
by the time we already signed the contract with PD,back in october 2013,when i came to TD and read his.....too late....
we bought the small plot,not far away from my wife parents in 2011,done the perimeter wall(i dont want the neighbors to look what farang does all the time....lol....).....and were looking for a decent builder with a nice house......
we ended up with PD,because they had a couple of offices in BKK.
dealing with them and make changes was easy,because i did FIFO(fly in fly out)from AUS....and i told them that i will do all the electrical work in the house....
they werent happy on the beginnings and said,no problem you can add as many powerpoints as you want....yeah for about 600Bht one piece and cheap shit....lol..
the whole electrical layout on the original was crap anyway.....and me as a sparky would never trust a thai sparky....have seen enough of it......
well on the end it was all good...you have to keep up with construction flow and we can give you no warranty for the electrical work they said....no worries mate i said.....
our place and upfill,perimeter wall(rio bars)and earthing
some pics from our site(650sm) and upfill,(brother in law)perimeter wall with continuation of the rio bar all around(welded)for my earthing(ground earth)with copper wire attached to the rio bars(10mm rio)...local dudes with my dad in law
i still need to scan my updated drawings from the house........havent got them on file...yet to upload here....(when we signed the contract with PD in 2013)
https://teakdoor.com/Gallery/albums/u...486cropped.jpg
https://teakdoor.com/Gallery/albums/u...32_cropped.jpg
https://teakdoor.com/Gallery/albums/u...78_cropped.jpg
https://teakdoor.com/Gallery/albums/u...771cropped.jpg
Various and current state of the house
thxs for all the replies...
my grey hair grew a lot more during the house-built....and yes it was-still stressful sometimes to deal with them....my wife translates it to thai...and then back to english.....
its better i forgot a lot of thai in the last couple of years(went to school almost a year in bkk)i reckon its better otherwise Somchai and team wouldnt be very happy with me..
still couldnt manage to upload my updated drawings,looks like only jpg. are allowed...have to scan them first then....
there is fair a bit of things i want to share,help others,tell what happend with us,people who want to build a house....etc...whether to go with PD HOUSE or not.
i dont want that someone just goes with PD while seeing stuff here(i think it happend before-not me,someone else)
we would get 10'000-20'000Bht from PD if we could bring them another customer.
at this stage i would not recommend to build with PD....:sorry1:
(pro's and contra later......)
we had to cancel-hold back nearly everything we ordered early October.
Kitchen,in built furniture,air con,beds,curtains,ceiling fans, dining table and so on.
talked with PD in august if its possible to finish inside,yes no worries again from them....
as soon as we left for bkk they left too for months,no one here.....because of a huge house in korat(more money)
ive got friends from switzerland who come over mid january,they cant sleep in the new house with us.....we have to stay in my wifes parents house...just annoying.....
confronted back then the foreman and he said there is no work here....what a f@#* head he is....
we told him to paint everything again indoors and fix ceilings,walls before laminate comes.....no hearings....
.....so try to upload some pics....
they just done the laminate and the steps last week...external contractors which have done a very good job indeed,in very happy with their work
there are some good tradesman here but it is a rarity.......
https://teakdoor.com/Gallery/albums/u...5860resize.jpg
https://teakdoor.com/Gallery/albums/u...5861resize.jpg
https://teakdoor.com/Gallery/albums/u...5863resize.jpg
back to the past-soiltest 16.11.13
signed our house contract in october in bkk 2013,they came to our land and tested the ground....
a couple of different tests around site.....
the result came out(a couple of weeks later) that it must be piled down.......hammering about 17 poles into the ground.......
https://teakdoor.com/Gallery/albums/u...9739resize.jpg
https://teakdoor.com/Gallery/albums/u...9730resize.jpg
https://teakdoor.com/Gallery/albums/u...9743resize.jpg
https://teakdoor.com/Gallery/albums/u...9738resize.jpg