Not being one to leave well enough along, I bit a little more than I cam chew . and started a storage/work shop area behind the house.
Between the house an the back fence wall there is a space about 3m wide
First I welded a work bench to have a work surface
Then I attached a 4.5m long P channel steel to the house. Was not hard because the wall is AAC block and it is easy to screw into , and tom that steel I welded beams to the fence, then I framed it all around and laid cross members for the metal roof to be screwed on.
So the area under roof will be 3meters X 4,5 meters.
I just finished putting the roof on and my whole body is aching , there are things aching that I didn't even know I had. LOL.
I'll take some better pictures tomorrow.