    Steel has arrived for the roof, once posts are poured I understand new crew will come to install roof.

    Snowbird house build in LOS-10-12-19-3-jpg

    Forms are in place and ready for cement.

    Snowbird house build in LOS-10-12-19-1-jpg

  2. #227
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by mikenot View Post
    I notice they did not close off the tops of the pipes before the pour, it's too late for this but it is a good precaution to cover the pipes to prevent any concrete being splashed into them and perhaps blocking them. Even just a plastic bag taped over the top would do.
    I was reading an old build story a few days ago where somebody had to rip up the kitchen floor because the drain pipe was blocked .....with concrete.
    Mike,
    Had the daughter take a picture below bathroom, appears what they did is place pieces of pipe where they need to go in form, guessing they will remove pieces of pipe after forms are removed and use holes for pipe that will be installed later.

    Snowbird house build in LOS-10-11-19-3-jpg

  3. #228
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Rumor has it that the 2nd floor posts have been poured, and by the evidence on these pictures I think they have.

    Snowbird house build in LOS-10-13-19-1-jpg

    Looks like this pour was done manually, bucket brigade I would guess.

    Snowbird house build in LOS-10-13-19-3-jpg

    I little too much concrete mixed, guess it will be a good base for driveway.

    Snowbird house build in LOS-10-13-19-5-jpg

    View from the back of house
    Last edited by dennis4558; 14-10-2019 at 07:29 AM.

  4. #229
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    The beatings helped, here is a video link to first walk through of house.

    https://youtu.be/ySaXjoiVOCM

  5. #230
    Member
    Join Date
    Sep 2007
    Last Online
    Yesterday @ 04:36 PM
    Location
    Ubon Ratchathani
    Posts
    408
    ^ Now you just have to train her to turn the camera and have horizontal video

  6. #231
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by mikenot View Post
    ^ Now you just have to train her to turn the camera and have horizontal video
    Hi Mike, I might be walking on thin ice trying to tell a woman how to use her phone, I don't want to lose my camera person at this point.

  7. #232
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    As you seen in the video the forms are off

    Snowbird house build in LOS-10-15-19-1-jpg

    Snowbird house build in LOS-10-15-19-4-jpg

    Posts are wrapped and waiting for the roofing crew, which I was told was happening this week

    Snowbird house build in LOS-10-15-19-3-jpg

    Snowbird house build in LOS-10-15-19-2-jpg

  8. #233
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    The roofing crew has arrived.

    Snowbird house build in LOS-10-18-19-1-jpg

    Roof steel laid out and getting some paint.

    Snowbird house build in LOS-10-18-19-2-jpg
    Needed to pick out the roof tiles, 2 week delivery time.

  9. #234
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Daughter found a video of how the reflective foil sheeting is to be install and posted it on our construction Line page, now the builder shouldn't have a problem knowing how we want it done.


    When I was in Thailand last year we went to some building sites, all the houses we looked at had the reflective foil under the roofing tiles, when asking the builder about it, they just said "that's the way we do it", that comment eliminated several builders.
    Last edited by dennis4558; 19-10-2019 at 09:03 AM.

  10. #235
    Thailand Expat David48atTD's Avatar
    Join Date
    Jan 2016
    Last Online
    @
    Location
    Palace Far from Worries
    Posts
    14,393
    Quote Originally Posted by dennis4558 View Post
    Daughter found a video of how the reflective foil sheeting is to be install and posted it on our construction Line page, now the builder shouldn't have a problem knowing how we want it done.
    I truly enjoyed watching that instructional video.

    Snowbird house build in LOS-screenshot_2019-10-22-36-png

    Cardboard washers, safety gloves and helmets.

    Heck, they even had enclosed shoes on

    But reflective sarking is a must with a new build in Thailand if it's within the budget.

    When we partially renovated the Thai Family Farmhouse, we used in the areas we inhabit.
    Someone is sitting in the shade today because someone planted a tree a long time ago ...


  11. #236
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by David48atTD View Post
    Heck, they even had enclosed shoes on
    Hi David, I'll bet that won't be part of our crews safety gear, lol

    We just had a meeting last night about the reflective sheeting and he was complaining about installing it that way, because a different crew does the shingles versus the crew that is doing the steel rafters, he thinks the sheeting will be damaged by weather before they get the roof on. " Not our problem" that's the way it's going to get done. I was surprised that's what wife and daughter told him.

    We also had a issue with the shingles we wanted, the one's we had picked were an extra cost, he said 30,000 baht, I said no way put on what was in the bid. By the time we finished with our meeting he cut that price in half to 15 t baht. So we went with the shingles (roof tiles) we wanted. I think the reason he cut the price that much is because these shingles can be delivered sooner. If the sheeting get damaged and he has to replace it, it would be a big expense for him.

  12. #237
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    They have a good start on the roof steel, most of the main steel is up, just some bracing then the reflective sheeting and purlins.

    Snowbird house build in LOS-10-23-19-1-jpg

    Snowbird house build in LOS-10-23-19-2-jpg



    Snowbird house build in LOS-10-23-19-3-jpg

    I bet you guys are all jealous and wish you had a ladder like this at your house

    Daughter said there are just two guys doing the steel work, when they finish another crew comes in to do the roof shingles (tiles)
    Last edited by dennis4558; 24-10-2019 at 07:56 AM.

  13. #238
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    More progress on the roof

    Snowbird house build in LOS-10-25-19-5-jpg

    I would have thought there would have been more bracing on the main steel, but I guess they don't have to worry about snow load like we do here.

    Snowbird house build in LOS-10-25-19-2-jpg

    Reflective sheeting going on and in the right place must help to have a video for training

  14. #239
    Thailand Expat

    Join Date
    Jul 2011
    Last Online
    25-01-2022 @ 04:27 AM
    Location
    Ballarat Australia
    Posts
    1,458
    The Thai's are very slow when it comes to insulation, I had a young man snigger and say, we dont use unsulation in Thailand.
    Even the big building supply store's keep a very limited range, well that was the case 4 or 5 years ago.

  15. #240
    Days Work Done! Norton's Avatar
    Join Date
    Oct 2007
    Last Online
    Today @ 06:55 AM
    Location
    Roiet
    Posts
    34,935
    Quote Originally Posted by dennis4558 View Post
    More progress on the roof
    Looking good. Steel and foil looks ok. Forgot what roof tiles you are going to have? Assume many more steel slats to attach will be needed and installed on top of foil?

    Will drop by next in Roi Et.

  16. #241
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by Mozzbie47 View Post
    The Thai's are very slow when it comes to insulation, I had a young man snigger and say, we dont use unsulation in Thailand.
    Even the big building supply store's keep a very limited range, well that was the case 4 or 5 years ago.
    Hi Mozzbie, I think you're right and when they do use it they put it on wrong. That's why we sent a video to the builder on how it is supposed to be installed.

  17. #242
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    [QUOTE=Norton;4017989]Looking good. Steel and foil looks ok. Forgot what roof tiles you are going to have? Assume many more steel slats to attach will be needed and installed on top of foil?

    Thanks Norton, Here's that photo of the tiles.

    Snowbird house build in LOS-10-18-19-2-jpg
    Not really a good picture of finished roof but gives you some idea.

  18. #243
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    More progress on putting on the reflective foil.

    Snowbird house build in LOS-10-27-19-1-jpg

    Snowbird house build in LOS-10-27-19-10-jpg

    It doesn't look like they've installed purlins on top of foil to hold it in place. Question, don't know where or how to space them or not there job, roofing crews job, but why put the foil on if you aren't going to hold it down.

    Snowbird house build in LOS-10-27-19-2-jpg

    I tried to get the daughter to go on top to get some pictures, you can guess what she told me.

  19. #244
    Member
    knowsitlike's Avatar
    Join Date
    Oct 2018
    Last Online
    02-07-2021 @ 05:28 PM
    Location
    Bangkok
    Posts
    614
    Hi Dennis, thanks for the thread and write up very helpful as always to follow these. I had a question as to how they will finish the top of the columns to the steel roof beams? as currently it looks from the photos like they are connected only into the rebar out of the top of the column with a space- are they going to put another concrete form along to tie that in later? I’m no builder in Thailand (yet) but interested to see how that is done. Cheers

  20. #245
    Thailand Expat David48atTD's Avatar
    Join Date
    Jan 2016
    Last Online
    @
    Location
    Palace Far from Worries
    Posts
    14,393
    Quote Originally Posted by dennis4558 View Post
    Snowbird house build in LOS-10-27-19-10-jpg

    Something, if you could explain for me.

    To do with how the Roof joists/bearers are attached to the posts?





    What I don't understand is why the rero (steel reinforcing) in the concrete upright posts is bearing the weight of the roof?

    I've seen in other constructions and when we did our carport, that the rero protrudes through the concrete post, but the bearer sits on top of the concrete post (so that the weight of the structure above is carried by the post and not the rero) and the protruded rero is simply welded to the bearer.

    As in when we built our carport ...



    I'm sure there is a logical explanation.

    Maybe Thai logic?
    Attached Thumbnails Attached Thumbnails Snowbird house build in LOS-10-27-19-10-jpg   Snowbird house build in LOS-10-27-19-10-crop-small  

  21. #246
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Good question Knows & David, I just posted the picture and asked the same question of our construction group on Line, we'll see what kind of answer we get.

  22. #247
    Thailand Expat

    Join Date
    Feb 2010
    Last Online
    @
    Posts
    1,742
    Quote Originally Posted by dennis4558 View Post
    Good question Knows & David, I just posted the picture and asked the same question of our construction group on Line, we'll see what kind of answer we get.
    This is the same question I wanted to ask as well. I think it probably came about because they didn't make the concrete in the pillars high enough, which could have been due to them not having long enough formwork or they just didn't fill the forms full.

    Anyway the way I have seen this issue "fixed" is for them to come along later and add concrete to the top of the pillars by hand to fill the gap which then protects the steel from rusting.
    While (in my opinion) this might look OK it isn't the best as the weight of the roof then is on "fresh" concrete. So the end result is your roof is virtually being held up by the steel in the pillar.

    So if were me the main thing I would want them to do is fill in the concrete ASAP and preferably before anymore weight gets added to the roof. I didn't really make out whether your tiles were concrete type tiles but if they are then they weigh a lot.

    As for the 'Thai" solution it will be " Farang think too much!"

  23. #248
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by ootai View Post
    This is the same question I wanted to ask as well. I think it probably came about because they didn't make the concrete in the pillars high enough, which could have been due to them not having long enough formwork or they just didn't fill the forms full.

    Anyway the way I have seen this issue "fixed" is for them to come along later and add concrete to the top of the pillars by hand to fill the gap which then protects the steel from rusting.
    While (in my opinion) this might look OK it isn't the best as the weight of the roof then is on "fresh" concrete. So the end result is your roof is virtually being held up by the steel in the pillar.

    So if were me the main thing I would want them to do is fill in the concrete ASAP and preferably before anymore weight gets added to the roof. I didn't really make out whether your tiles were concrete type tiles but if they are then they weigh a lot.

    As for the 'Thai" solution it will be " Farang think too much!"
    Yep Ootai, that's what they are going to do, filling with concrete today. Roof tiles still on order so concrete will have some time to cure before weight of roof tiles are put on.

  24. #249
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Ootai, I had the wife read spec's on tiles, she said they weigh 5.1 kilo each, so that's alot of weight on the roof.

  25. #250
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    We finally got some activity on the site again.

    Snowbird house build in LOS-11-2-19-1-jpg

    Looks like the 10 cm block have arrived for the south and west walls.

    Snowbird house build in LOS-11-2-19-2-jpg

    Snowbird house build in LOS-11-2-19-3-jpg

    Not sure what this is, I've asked but still haven't gotten a reply.

Page 10 of 23 FirstFirst ... 2345678910111213141516171820 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •