  1. #101
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by Norton View Post
    Let me rephase. Is the house in Roi Et city or elsewhere in the province.
    Norton,
    The house is in Roi Et just north of Hwy 23 inside Hwy 232. We'll invite you over when we get over there and you can check it out.

  2. #102
    Days Work Done! Norton's Avatar
    Join Date
    Oct 2007
    Last Online
    Today @ 03:31 PM
    Location
    Roiet
    Posts
    34,871
    Got it. Just inside the northern ring road. Reason I asked, I would be happy to pop by and have a look during construction if you want me to.

  3. #103
    Thailand Expat David48atTD's Avatar
    Join Date
    Jan 2016
    Last Online
    @
    Location
    Palace Far from Worries
    Posts
    14,389
    Quote Originally Posted by Norton View Post
    Got it. Just inside the northern ring road. Reason I asked, I would be happy to pop by and have a look during construction if you want me to.
    Work Permit?

    Professional advice, or just a friend?

  4. #104
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by Norton View Post
    Reason I asked, I would be happy to pop by and have a look during construction if you want me to.
    Sure Norton, I don't have a address, but do you remember where her sister lives? It's just about 2 blocks from there.

  5. #105
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by David48atTD View Post
    just a friend
    Hi David,
    I met Norton the last time we were in LOS, stopped by his house (nice house) and went out for lunch together, had a good time.

  6. #106
    Thailand Expat David48atTD's Avatar
    Join Date
    Jan 2016
    Last Online
    @
    Location
    Palace Far from Worries
    Posts
    14,389
    ^ Sure

    I taking the piss out of Norton ... I know him a little from other places.

  7. #107
    Thailand Expat

    Join Date
    Jul 2011
    Last Online
    25-01-2022 @ 04:27 AM
    Location
    Ballarat Australia
    Posts
    1,458
    Quote Originally Posted by David48atTD View Post
    ^ Sure

    I taking the piss out of Norton ... I know him a little from other places.
    Oh I hope you didnt offend him..

  8. #108
    Days Work Done! Norton's Avatar
    Join Date
    Oct 2007
    Last Online
    Today @ 03:31 PM
    Location
    Roiet
    Posts
    34,871
    Quote Originally Posted by Mozzbie47 View Post
    Oh I hope you didnt offend him..
    Impossible. Way beyond the easily offended stage.

    Quote Originally Posted by David48atTD View Post
    Professional advice, or just a friend?
    Just a fellow TD member assisting another. That's what we do or should be doing.
    Answerered your PM Mozz. Line ID sent.

  9. #109
    Thailand Expat

    Join Date
    Jul 2011
    Last Online
    25-01-2022 @ 04:27 AM
    Location
    Ballarat Australia
    Posts
    1,458
    Quote Originally Posted by Norton View Post
    Impossible. Way beyond the easily offended stage.


    Just a fellow TD member assisting another. That's what we do or should be doing.
    Answerered your PM Mozz. Line ID sent.
    I jest sir,,I try to help other on TD always have.

  10. #110
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Rain for the next couple days so I doubt we'll see any work being done, will update once the rain stops.

  11. #111
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    While waiting for the rain to stop, between showers they are getting stakes ready to set up forms for beams, builder went to get wood for forms but on his way his pickup almost died several times driving through water and when he arrived at shop they were closed due to flooding, so another delay.

    Snowbird house build in LOS-9-3-19-1-jpg

    In the meantime it looks like they are raising rebar for outside kitchen.

    Snowbird house build in LOS-9-3-19-2-jpg

    I'm curious how they are going to backfill and support under beam, all the loose dirt is mud, be interesting to see Thai solution to that.
    Attached Thumbnails Attached Thumbnails Snowbird house build in LOS-9-3-19-1-jpg   Snowbird house build in LOS-9-3-19-2-jpg  

  12. #112
    Days Work Done! Norton's Avatar
    Join Date
    Oct 2007
    Last Online
    Today @ 03:31 PM
    Location
    Roiet
    Posts
    34,871
    Quote Originally Posted by dennis4558 View Post
    waiting for the rain to stop,
    As of 4am this new day, still a steady rain with no let up in sight. Managed to get to Roiet city yesterday as flood water level down a bit allowing exit from my villahe after 4 days stuck at home.

    Afraid little or no progress on build for next several days Dennis.
    "Whenever you find yourself on the side of the majority, it is time to pause and reflect,"

  13. #113
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by Norton View Post
    still a steady rain with no let up in sight
    Hi Norton, were you able to stop by the site when you were in Roi Et? I looked at the forecast for there and that's what I seen too, I guess we'll just have to wait until the weather clears up.

  14. #114
    Days Work Done! Norton's Avatar
    Join Date
    Oct 2007
    Last Online
    Today @ 03:31 PM
    Location
    Roiet
    Posts
    34,871
    Quote Originally Posted by dennis4558 View Post
    were you able to stop by the site when you were in Roi Et?
    No, Had a friend take me in his truck so didn't want to bother him. Our wee Honda Jazz would have been swept away.

  15. #115
    Thailand Expat

    Join Date
    Feb 2010
    Last Online
    @
    Posts
    1,742
    Dennis you said,

    "I'm curious how they are going to backfill and support under beam, all the loose dirt is mud, be interesting to see Thai solution to that."

    As it is a "beam" it does not require any support underneath once the concrete has dried. The concrete will reach roughly 70% of its final strentgh after 7 days and 90+% after 28 days.
    So providing the rebar is strong enough to support any vertical load the beam will be self supporting.

    If you are worried about the fill between the beams supporting the floor then I believe they will most likely use precast concrete slabs laid across the beams and then put rebar above them and then pour the concrete floor.

    So in the end you could theoratically leave the area under the beams and floor empty as in have a house raised above the natural ground level.

    Hope all that makes sense.

  16. #116
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by ootai View Post
    As it is a "beam" it does not require any support underneath once the concrete has dried. The concrete will reach roughly 70% of its final strentgh after 7 days and 90+% after 28 days.
    So providing the rebar is strong enough to support any vertical load the beam will be self supporting.
    Hi Ootai, I understand that, what I was talking about was because they had to raise the rebar for beams 30 cm in the outdoor kitchen, I was wondering how they were going to backfill area below on distance that was raised, here we would use sand and compact, but there I'm sure they didn't do that and the only thing I see that was available was wet dirt or mud which wouldn't be much to hold the bottom of the concrete, the rest of the forms have a couple inches of concrete for base.

  17. #117
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Water went down and forms were delivered to site, and I mean regular concrete forms ( I'm impressed), couple days and they were done ready for concrete.

    Snowbird house build in LOS-9-5-19-4-jpg

    Snowbird house build in LOS-9-5-19-1-jpg

    Looking in from the street

    Snowbird house build in LOS-9-5-19-5-jpg

    Living room, bathroom on the right, not able to see entry and front bedroom. I'm still trying to explain how to take pictures but I must remain calm if I get too excited I may not get any.

    Snowbird house build in LOS-9-5-19-7-jpg

    Second bedroom/utility room on left, kitchen on right, beyond that is outdoor kitchen, it looks big but daughter said it was 2.5 meter like it's supposed to be.

    Snowbird house build in LOS-9-5-19-3-jpg

    And a nice picture of small building rebar behind house. The pour is scheduled for this weekend, I asked for some action photos of that, not sure if it will happen.
    Attached Thumbnails Attached Thumbnails Snowbird house build in LOS-9-5-19-4-jpg   Snowbird house build in LOS-9-5-19-1-jpg   Snowbird house build in LOS-9-5-19-5-jpg   Snowbird house build in LOS-9-5-19-7-jpg   Snowbird house build in LOS-9-5-19-3-jpg  


  18. #118
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    A little more news, additional crew member this past week, foreman's DIL had a baby, week later mother back on the job working, tough woman.

  19. #119
    Thailand Expat

    Join Date
    Feb 2010
    Last Online
    @
    Posts
    1,742
    Quote Originally Posted by dennis4558 View Post
    Hi Ootai, I understand that, what I was talking about was because they had to raise the rebar for beams 30 cm in the outdoor kitchen, I was wondering how they were going to backfill area below on distance that was raised, here we would use sand and compact, but there I'm sure they didn't do that and the only thing I see that was available was wet dirt or mud which wouldn't be much to hold the bottom of the concrete, the rest of the forms have a couple inches of concrete for base.

    Dennis sorry about that I misunderstood what you were saying/asking.
    I reckon they will just shutter down to the current level and then infill with some material and then concrete on top of that.

    My question is why are you raising the floor of the outside kitchen 30cm. I would have expected it to be lowered like they lower the bathroom floors.

  20. #120
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    I was jumping the gun a little, shoring up the forms to be completed this weekend, and cement truck comes monday, A (builder) said all beams should be poured by friday. Wants check on monday for next phase.

    Snowbird house build in LOS-9-7-19-11-jpg

    Front of house forms braced.

    Snowbird house build in LOS-9-7-19-9-jpg

    Snowbird house build in LOS-9-7-19-1-jpg

    Still working on forms at rear of house.
    Attached Thumbnails Attached Thumbnails Snowbird house build in LOS-9-7-19-11-jpg   Snowbird house build in LOS-9-7-19-9-jpg   Snowbird house build in LOS-9-7-19-1-jpg  

  21. #121
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    I finally figured out how to get picture of floor plan, I had it in pdf but that didn't work, I used clip art to get photo image.


    Snowbird house build in LOS-first-floor-plan-jpg
    First floor.

    Snowbird house build in LOS-2nd-floor-plan-jpg
    Second floor.

    Snowbird house build in LOS-small-bldg-png
    Small bldg. Urinal, stool/shower, utility room (water tank, water pump, power panel to external lights, and gate, etc., tool shop
    Attached Thumbnails Attached Thumbnails Snowbird house build in LOS-first-floor-plan-jpg   Snowbird house build in LOS-2nd-floor-plan-jpg   Snowbird house build in LOS-small-bldg-png  

  22. #122
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by ootai View Post
    My question is why are you raising the floor of the outside kitchen 30cm. I would have expected it to be lowered like they lower the bathroom floors.
    They had the outside kitchen 30 cm lower than inside kitchen, I didn't want steps, if it would have been like bathrooms which would have been about 5 cm I would have been OK with that. Our bathrooms will be at same level, only shower area will be lowered. Dry bathroom wet shower

  23. #123
    Thailand Expat

    Join Date
    Feb 2010
    Last Online
    @
    Posts
    1,742
    Dennis
    Thanks for the explanation. I looked at the pictures and it appeared to me that the floor of the outside kitchen was level with the rest of the house and you were going to raise it up 30cm.
    I understand you not wanting a step between the outside kitchen and the inside but if it was me I would still have some difference in floor levels.
    We have an outside kitchen and to me it seems like the missus likes it because she doesn't have to be so careful about making a bit of a mess.
    If the floor gets messy just get the hose and wash it out.

    cheers

  24. #124
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    [QUOTE=ootai;3998996]If the floor gets messy just get the hose and wash it out.

    Then I'd have to put a floor drain in.

  25. #125
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Here's a couple photos the builder posted on Line, closeups of form work

    Snowbird house build in LOS-9-8-19-1-jpg

    Snowbird house build in LOS-9-8-19-2-jpg
    Attached Thumbnails Attached Thumbnails Snowbird house build in LOS-9-8-19-1-jpg   Snowbird house build in LOS-9-8-19-2-jpg  

Page 5 of 23 FirstFirst 1234567891011121315 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •