  1. #326
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by NamPikToot View Post
    Looks like you've filtered 2 out which is much as you can hope for in PMing from afar.
    You're right NPT, so far it's been a 2, they've been really good about fixing mistakes and making minor changes to the plan. No major mistakes.

  2. #327
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Things are moving alone with the block work

    Snowbird house build in LOS-12-1-19-9-jpg

    1st floor back bedroom closed in (except outside wall still waiting on 10 cm block) and door frame in

    Snowbird house build in LOS-12-1-19-5-jpg

    Snowbird house build in LOS-12-1-19-11-jpg

    Couple pics that show a little better how steps will be extended

    Snowbird house build in LOS-12-1-19-7-jpg

    Center stairway wall extended to same distance as bottom step

    Snowbird house build in LOS-12-1-19-13-jpg

    1st floor bathroom ready for floor concrete, I didn't see picture of p-trap installed by I was assured by main worker that it's there. 2nd floor p-trap for shower and sink is going to be installed on outside of house. That'll be harder to clean out if plugged unless they install some kind of access. Hope to get pictures of that so I know where it's at for future reference.
    Attached Thumbnails Attached Thumbnails Snowbird house build in LOS-12-1-19-9-jpg   Snowbird house build in LOS-12-1-19-5-jpg   Snowbird house build in LOS-12-1-19-11-jpg   Snowbird house build in LOS-12-1-19-7-jpg   Snowbird house build in LOS-12-1-19-13-jpg  


  3. #328
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    A couple things about the above bathroom picture, they cut the wall to lower the window now I'll be able to reach it and the hot and cold water to the shower at the present is coming up the same place as drain so I would think more fittings need to be installed to get that into the wall, maybe they'll do that after the floor is poured and put it over under the tile.

  4. #329
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    More progress on the bathrooms

    Snowbird house build in LOS-12-3-19-11-jpg

    1st floor bathroom floor being poured

    Snowbird house build in LOS-12-3-19-4-jpg

    1st floor bath floor finished, this will be a wet bath, shower area lower than rest of bath, and rest of bath lower than rest of house floor

    Snowbird house build in LOS-12-3-19-3-jpg

    Openings for window and fan, opening for fan looks like it would be above ceiling but maybe it's the angle of the photo

    Snowbird house build in LOS-12-3-19-8-jpg

    A look inside 2nd floor bath, daughter complained it wasn't big enough, I told her it's not for her to have a party inside, it's just to do your thing and get out
    Attached Thumbnails Attached Thumbnails Snowbird house build in LOS-12-3-19-11-jpg   Snowbird house build in LOS-12-3-19-4-jpg   Snowbird house build in LOS-12-3-19-3-jpg   Snowbird house build in LOS-12-3-19-8-jpg  

  5. #330
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Other 2nd floor completed work

    Snowbird house build in LOS-12-3-19-5-jpg

    Wood frames for mounting windows

    Snowbird house build in LOS-12-3-19-9-jpg

    Little more block work done on 2nd floor front bedroom

    Snowbird house build in LOS-12-3-19-7-jpg

    View from back to front on 2nd floor, 10 cm block are supposed to arrive this week

    Snowbird house build in LOS-12-3-19-2-jpg

    Shot of plumbing from the outside of 2nd floor bath with p-trap installed
    Attached Thumbnails Attached Thumbnails Snowbird house build in LOS-12-3-19-5-jpg   Snowbird house build in LOS-12-3-19-9-jpg   Snowbird house build in LOS-12-3-19-7-jpg   Snowbird house build in LOS-12-3-19-2-jpg  

  6. #331
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Electrician is on site and is cutting holes

    Snowbird house build in LOS-8122019_191206_0490-jpg

    Snowbird house build in LOS-8122019_191206_0493-jpg

    Snowbird house build in LOS-8122019_191206_0492-jpg

    On this last one they are going to have to change it, don't want outlet and switches above each other
    Attached Thumbnails Attached Thumbnails Snowbird house build in LOS-8122019_191206_0492-jpg   Snowbird house build in LOS-8122019_191206_0493-jpg   Snowbird house build in LOS-8122019_191206_0490-jpg  

  7. #332
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    10 cm blocks have finally arrived, story has it our builders supplier/distributor hadn't paid his bill to the block manufacturer so they were holding up shipment

    Snowbird house build in LOS-12-14-19-1-jpg

    Snowbird house build in LOS-12-14-19-2-jpg

    Workers had also run out of 7.5 cm block but those are on site also, so progress is being made

    Snowbird house build in LOS-12-12-19-1-jpg

    Door frames for 2nd floor bathroom and front bedroom door frames are in and walls topped off

    Snowbird house build in LOS-12-14-19-6-jpg

    Also installing door frame for inside kitchen

    Snowbird house build in LOS-12-14-19-3-jpg

    Electrician's back at it too roughing in locations, he complaining about number of outlets/power points required, to make him happier we added 4 more
    Attached Thumbnails Attached Thumbnails Snowbird house build in LOS-12-14-19-1-jpg   Snowbird house build in LOS-12-14-19-2-jpg   Snowbird house build in LOS-12-12-19-1-jpg   Snowbird house build in LOS-12-14-19-6-jpg   Snowbird house build in LOS-12-14-19-3-jpg  


  8. #333
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    10 cm walls are going up

    Snowbird house build in LOS-12-15-19-1-jpg


    Snowbird house build in LOS-12-15-19-2-jpg

    South and west walls 2nd floor
    Attached Thumbnails Attached Thumbnails Snowbird house build in LOS-12-15-19-1-jpg   Snowbird house build in LOS-12-15-19-2-jpg  

  9. #334
    Excommunicated baldrick's Avatar
    Join Date
    Apr 2006
    Last Online
    Today @ 12:50 PM
    Posts
    24,820
    looking at your stairs - is the last step at the top higher than the rest ?

    and walling in the stairs cause issues when manoeuvring mattresses upstairs

    though I have watched in dismay as a good innerspring mattress was folded in half and roped to take it up stairs

  10. #335
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by baldrick View Post
    is the last step at the top higher than the rest
    Hi Baldrick, I hope once they're finished they'll all be the same or I'll be breaking my neck going up, going down usually doesn't bother me but going up I'll trip, nothing worse than steps that don't have the same size risers.

  11. #336
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by baldrick View Post
    walling in the stairs cause issues when manoeuvring mattresses upstairs
    We will have an open stairwell, only a handrail to maneuver around when taking things up or down. This is an example of what it's supposed to look like when finished.

    Snowbird house build in LOS-10950251062796-jpg
    Attached Thumbnails Attached Thumbnails Snowbird house build in LOS-10950251062796-jpg  

  12. #337
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Not much progress to report, daughters phone went dead after one picture.

    Snowbird house build in LOS-12-17-19-jpg

    2nd floor west bedroom, another wall goes in for walk-in closet
    Attached Thumbnails Attached Thumbnails Snowbird house build in LOS-12-17-19-jpg  

  13. #338
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Here's a view we haven't seen for a while

    Snowbird house build in LOS-12-18-19-1-jpg

    South side to the west

    Snowbird house build in LOS-12-18-19-2-jpg

    South side to the east

    Snowbird house build in LOS-12-18-19-3-jpg

    Snowbird house build in LOS-12-18-19-4-jpg

    More 2nd floor pics, first to the back or west and second to the front or east, he says he will be finished blocking and rendering the outside by the weekend, I'll be surprised if they are. The inside the electrician will need to finish before that can be rendered.
    Attached Thumbnails Attached Thumbnails Snowbird house build in LOS-12-18-19-1-jpg   Snowbird house build in LOS-12-18-19-4-jpg   Snowbird house build in LOS-12-18-19-3-jpg   Snowbird house build in LOS-12-18-19-2-jpg  

  14. #339
    Thailand Expat David48atTD's Avatar
    Join Date
    Jan 2016
    Last Online
    @
    Location
    Palace Far from Worries
    Posts
    14,393
    Great progress being made and thanks for the update

  15. #340
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by David48atTD View Post
    Great progress being made and thanks for the update
    Thanks David, and thanks for stopping by.

  16. #341
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    2nd floor living room getting close to being finished

    Snowbird house build in LOS-12-20-19-3-jpg

    Snowbird house build in LOS-12-20-19-4-jpg

    West bedroom, south wall done

    Snowbird house build in LOS-12-20-19-1-jpg

    1st floor back bedroom

    Snowbird house build in LOS-12-20-19-2-jpg

    1st floor living room, I don't think they will get the south wall finished by the end of this weekend.
    Attached Thumbnails Attached Thumbnails Snowbird house build in LOS-12-20-19-3-jpg   Snowbird house build in LOS-12-20-19-4-jpg   Snowbird house build in LOS-12-20-19-1-jpg   Snowbird house build in LOS-12-20-19-2-jpg  

  17. #342
    I'm in Jail

    Join Date
    Jan 2013
    Last Online
    20-04-2024 @ 03:45 PM
    Location
    Bungling in the jungle
    Posts
    10,387
    Nice pics. Good luck with the build.
    Our place survived the first flooding in ten years. I hope it floods more or at least the river maintains a reasonable level. It's been sketchy as of late.

    Again, best of luck.

  18. #343
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Another bit of news, wife and owners of property with old house have agreed on a selling price, final terms to be hashed out when we get there in about 3 weeks. That will make the perimeter fence a bit easier because south side has a two story townhouse so won't need a fence there.

  19. #344
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by fishlocker View Post
    Nice pics. Good luck with the build.
    Our place survived the first flooding in ten years. I hope it floods more or at least the river maintains a reasonable level. It's been sketchy as of late.

    Again, best of luck.
    Thanks Fishlocker, did you get any water close to your house?

  20. #345
    Thailand Expat

    Join Date
    Feb 2010
    Last Online
    @
    Posts
    1,742
    Dennis
    Looks like things are moving along OK. Good news on the house/block next door, I assume you will knock the old house down.
    I couldn't live with a neighbour that close to me.

    Just a question, I see that the outside wall/s on the staircase have not been bricked in yet. Are you going to or are you planning on windows for that area?

    Keep posting I look forward to your updates.

  21. #346
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by ootai View Post
    Looks like things are moving along OK. Good news on the house/block next door, I assume you will knock the old house down.
    I couldn't live with a neighbour that close to me.
    Hi Ootai, not sure what we'll do with the old house, either we tear in down or I convert it into a workshop for myself, definitely not a house to live in, my luck more family would move in. I waiting to take another look at it before we decide, because of the level if we don't tear it down we will have to add fill tear off the termite infested roof, add to the walls and put up new roof. Won't be this year maybe next years project.

  22. #347
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    [QUOTE=ootai;4038636]I see that the outside wall/s on the staircase have not been bricked in yet. Are you going to or are you planning on windows for that area?[/QUOTE

    Maybe this picture will answer your question

    Snowbird house build in LOS-12-21-19-1-jpg

    Starting to block in for window on stairs landing, south living room wall finished still have front / east wall to start on, most of it will be sliding door.

    Snowbird house build in LOS-12-21-19-2-jpg

    Working on wall for walk -in closet. No pictures of 1st floor so no idea what going on there. The only other thing she said was electrician cut more holes in the walls but no pictures.
    Attached Thumbnails Attached Thumbnails Snowbird house build in LOS-12-21-19-1-jpg   Snowbird house build in LOS-12-21-19-2-jpg  

  23. #348
    Thailand Expat
    Klondyke's Avatar
    Join Date
    Aug 2014
    Last Online
    26-09-2021 @ 10:28 PM
    Posts
    10,105
    Snowbird house build in LOS-12-21-19-2-jpg

    The partition wall: I would be afraid to keep it so for few days without a support - in case a strong draft blows through the house... (or a butterfly flew by)

  24. #349
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Quote Originally Posted by Klondyke View Post
    Snowbird house build in LOS-12-21-19-2-jpg

    The partition wall: I would be afraid to keep it so for few days without a support - in case a strong draft blows through the house... (or a butterfly flew by)
    I think you're right Klondike, talked to the daughter this morning and she was running around trying to find a door and frame for her walk-in closet, she should have had that ready but that's the way she is,waits until the last minute to get things done. She wanted a hidden door that looked like a shelf don't know if she found one.

  25. #350
    Member

    Join Date
    Jan 2012
    Last Online
    08-11-2020 @ 05:50 AM
    Posts
    611
    Snowbird house build in LOS-pivot-hidden-bookcase-door-trim-molding

Page 14 of 23 FirstFirst ... 4678910111213141516171819202122 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •