Quote:
Originally Posted by
VocalNeal
Out walking yesterday not running! Again PEA method. Do not use the existing supports for vertical support only for lateral support. This is kinda what PEA do also. So put another support the correct height beside your existing one , resting it on the same slab and simply bolt the two together.
So you end up with a dozen pairs of posts bolted together, with the original posts only going halfway up?
Hardly things of beauty, even by Thai standards!
Plus you'd have to drill holes through the original posts, while PEA 's are not only considerably bigger but have the holes already cast in to allow for it.