4 February 2008
Progress continues and the footers for the foundation of the walls are being constructed now. As you will see from the below pictures, the wall foundation is in the ground but the floor will be elevated up off the ground by about 75cm. I'm advised that the floor guys will come out and measure the particular dimensions, go back to the concrete floor making plant, pour the concrete into forms of the specific dimensions required, and deliver the pre-formed and made floor slab sections to the work site for tying into the foundation. Should be interesting. As I do not have the profound vocabulary of a home construction contractor, I trust you get the understanding of what I am talking about.
Here are some pictures of the progress being made.
![]()