Results 1 to 25 of 493

Hybrid View

  1. #1
    Thailand Expat
    SEA Traveler's Avatar
    Join Date
    Aug 2007
    Last Online
    01-11-2014 @ 09:25 AM
    Location
    Villa Sariano, Phala Beach, Ban Chang, Rayong, Thailand
    Posts
    3,790

    MTSINTERNATIONAL House

    4 February 2008

    Progress continues and the footers for the foundation of the walls are being constructed now. As you will see from the below pictures, the wall foundation is in the ground but the floor will be elevated up off the ground by about 75cm. I'm advised that the floor guys will come out and measure the particular dimensions, go back to the concrete floor making plant, pour the concrete into forms of the specific dimensions required, and deliver the pre-formed and made floor slab sections to the work site for tying into the foundation. Should be interesting. As I do not have the profound vocabulary of a home construction contractor, I trust you get the understanding of what I am talking about.

    Here are some pictures of the progress being made.

    "Don't Sweat the Small Stuff....and it is all small stuff"

  2. #2
    Thailand Expat
    SEA Traveler's Avatar
    Join Date
    Aug 2007
    Last Online
    01-11-2014 @ 09:25 AM
    Location
    Villa Sariano, Phala Beach, Ban Chang, Rayong, Thailand
    Posts
    3,790

    MTSINTERNATIONAL House

    and here are a few more pictures of the progress:




Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •