27 May 2008;
Progress on the interior of the house continues. Gypsum stepped ceilings being completed with tape and spackling. Patio tile being laid. And preparation for painting being made. What follows shows some of the updates.
https://teakdoor.com/Gallery/albums/u...2C_May__08.JPG
Above picture: Spacking being applied on gypsum to cover seam tape and screw holes.
https://teakdoor.com/Gallery/albums/u...2C_May__08.JPG
Above picture: stepped ceiling prior to application of tape and spackling.
https://teakdoor.com/Gallery/albums/u...2C_May__08.jpg
Above picture: more taping and spackling... Western kitchen area.
https://teakdoor.com/Gallery/albums/u...2C_May__08.JPG
Above picture: Upper part of pool patio tile being laid. I think the diamond template is a nice touch to berak up the monotonous standard patterns seen.
https://teakdoor.com/Gallery/albums/u...2C_May__08.JPG
Above picture: and another picture of the upper pool patio tile. The lower level pool patio should be started next week and will be able to show some additional pictures of that when started.