LoL..where do we sign!!!
Totally agree about the fire... yeah... I gotta have it
Printable View
Plinth beam shuttering
https://teakdoor.com/images/imported/2018/02/74.jpg
https://teakdoor.com/images/imported/2018/02/75.jpg
https://teakdoor.com/images/imported/2018/02/76.jpg
All ready for the pour (once the mixer truck can get on the site).
Some of my 'instructional' sketches...
As some of you may know, I am not adverse to 'getting the message across' with a scribble or a sketch or two. I'm not the worlds best artist so probably they hinder as much as they help (!) but never the less, as I cant speak a whole lot of Thai, they are a comfort to me and make me feel I am 'contributing' when PJ is on site with K. Pot...
Here's what I mean..
https://teakdoor.com/images/imported/2018/03/1175.jpg
He was asking where to put the plumbing, as we have not yet finalised the kitchen layout yet
https://teakdoor.com/images/imported/2018/03/1100.jpg
Again we were discussing outer shutters and inner windows...
https://teakdoor.com/images/imported/2018/03/1176.jpg
The PEA are moving that power pole off my land for free. I wanted to know how much to move it right 10M so that we have no pole in front of the plot. (sorry its a bit blurry)
https://teakdoor.com/images/imported/2018/03/1177.jpg
Although some way off, tile choices .... I want the diamond pattern (on the right), so I sketched it to avoid any confusion later...
https://teakdoor.com/images/imported/2018/03/1178.jpg
Boundary wall on the road side is 2.5M, but the rest is 2m... so I was showing the step down arrangements for each side of the plot
https://teakdoor.com/images/imported/2018/03/1164.jpg
https://teakdoor.com/images/imported/2018/03/1179.jpg
My duct bank arrangements under the slab 'just in case' we need to run anything front to back, so we can avoid breaking out the ground floor slab. Might not ever use it but its there anyway.
https://teakdoor.com/images/imported/2018/03/1087.jpg
Need an entrance gate, right? And pedestrian access? OK... my vision but not yet sure if we can do this. Hope so... no panic yet but will need to be agreed with the builder before he starts the boundary wall.
Sorry.... I have been a bit tied up with work so could not post anything the last few days...
Back on track now so will post the catch up pics today...
The column cages now completed...
https://teakdoor.com/images/imported/2018/03/1170.jpg
https://teakdoor.com/images/imported/2018/03/1171.jpg
https://teakdoor.com/images/imported/2018/03/1172.jpg
https://teakdoor.com/images/imported/2018/03/1173.jpg
https://teakdoor.com/images/imported/2018/03/1174.jpg
NB... thats the power pole i want to be moved to the right 10m
TD,
Thank you for an interesting thread. I follow with interest, having a piece of land and a plan. (Well, she has a piece of land and I have a plan.)
Your builder looks to be doing a great job.
One question.I don't see it asked here, apologies if I missed it: What made you opt for drilling and then casting piles in place? Most builds that I see rely on a ring of plinth beams only. On occasions where I see piles they are usually precast, hammered in to unequal depths of equal resistance, then cut off and capped. Your land looks pretty firm already, suggested by that drilling rig in your pictures.
I have no ideas about the relative merits and costs of the different options. Just curious. Thanks.
Query over the amount of cover on the plinth beam at the junction with the ground floor columns
Well... I had to have one query, right!?
It 'looked' like the cover was only about 10mm - not enough, in other words. No matter, I circled the areas and sent PJ to check. She brought the OrBorTor land engineer with her (he was going to visit anyway)and everyone met up on site.
https://teakdoor.com/images/imported/2018/03/1167.jpg
Turns out the picture is worth a 1000 words but can't get 1000 angles or perspective!
there is in fact 30mm of over as confirmed by the engineer
Hi Shutee, welcome and thanks for your input and interest...
OK.... it depends on the strength and ability of the land to support the load (ie the house) and the size of the house you are building (and engineers will tell me to mention point loading, bearing friction, etc etc!!)
In our case we took advice from the OrBorTor office. The top layer of ground looks firm but when wet it becomes springy, soft, and slippery i.e not so good. We built up the land in any case with another 1m of as dug material but it was no better than the original layer. Below that however is a much stronger and solid strata and thats what we wanted to get down to.
Often when you see small slab supports in the soil and a ring beam, it is a single story dwelling, ie much lighter. Someone will have done that calculation for the point loading and the strength of the soil and determined how many uprights are needed. As you say, the ring (plinth) beam and slab ties it all together. Its a sort of raft foundation, spreading the load so as nothing sinks.
Our 'dwelling' , when finished will have 2 stories and a substantial roof, with a footprint of 256m3. its being built in 2 stages - zone A and B now and zone C when funds allow (!).
So .. we have to pile. Now as to why we went with drill and cast. Simple really... K.Pot (builder) had all the equipment to drill and cast, could make super cages for the drill holes and gave a very good price to do it. Either method would have been Ok; we went with him as he has total control and it's in his interest to do a good job as the house he is then building rests on his pile work.
Buying the duct bank PVC pipes
So, going on from my sketch, here are the builders guys collecting the pipework to do it...
https://teakdoor.com/images/imported/2018/03/1164.jpg
https://teakdoor.com/images/imported/2018/03/1165.jpg
https://teakdoor.com/images/imported/2018/03/1166.jpg
I like it when a plan comes together...
Pouring the Plinth beam concrete
https://teakdoor.com/images/imported/2018/03/1158.jpg
I knew he would have a skip...
https://teakdoor.com/images/imported/2018/03/1159.jpg
The ladies keeping up though, with the buckets
https://teakdoor.com/images/imported/2018/03/1160.jpg
The ladies production line flat out...
https://teakdoor.com/images/imported/2018/03/1161.jpg
https://teakdoor.com/images/imported/2018/03/1162.jpg
https://teakdoor.com/images/imported/2018/03/1163.jpg
Of course, we are not hand mixing this pour, not enough time and we want a consistent mix
Digging out those pesky mango tree roots
https://teakdoor.com/images/imported/2018/03/1149.jpg
https://teakdoor.com/images/imported/2018/03/1150.jpg
https://teakdoor.com/images/imported/2018/03/1150.jpg
https://teakdoor.com/images/imported/2018/03/1151.jpg
https://teakdoor.com/images/imported/2018/03/1152.jpg
https://teakdoor.com/images/imported/2018/03/1153.jpg
https://teakdoor.com/images/imported/2018/03/1154.jpg
That mini-digger is surprisingly powerful...
https://teakdoor.com/images/imported/2018/03/1155.jpg
when he finished digging, he levelled everything up..
https://teakdoor.com/images/imported/2018/03/1156.jpg
https://teakdoor.com/images/imported/2018/03/1157.jpg
Another job completed.
Striking the plinth beam
https://teakdoor.com/images/imported/2018/03/1143.jpg
A good pile of shuttering had already been gathered. PJ's Bro checking proceedings...
https://teakdoor.com/images/imported/2018/03/1144.jpg
Yes..K.Pot confirms it s plinth beam, all right...
https://teakdoor.com/images/imported/2018/03/1145.jpg
shutter frames.
https://teakdoor.com/images/imported/2018/03/1146.jpg
OMG shutters everywhere!
https://teakdoor.com/images/imported/2018/03/1147.jpg
Khun Pot surveys the beam and I know hes thinking...pretty good, huh!?
https://teakdoor.com/images/imported/2018/03/1148.jpg
The column shutters were already being placed
Ground floor column shuttering
https://teakdoor.com/images/imported/2018/03/1134.jpg
some shutters placed before striking the plinth beam...
https://teakdoor.com/images/imported/2018/03/1135.jpg
https://teakdoor.com/images/imported/2018/03/1136.jpg
https://teakdoor.com/images/imported/2018/03/1137.jpg
reasonably straight...
https://teakdoor.com/images/imported/2018/03/1138.jpg
https://teakdoor.com/images/imported/2018/03/1139.jpg
the OrBorTor engineer dropped by to see the ring beam.
https://teakdoor.com/images/imported/2018/03/1140.jpg
https://teakdoor.com/images/imported/2018/03/1141.jpg
https://teakdoor.com/images/imported/2018/03/1142.jpg
....now, about that inspection...
Plinth Beam / general inspection
https://teakdoor.com/images/imported/2018/03/1126.jpg
the Engineer, Khun Ek arrives from the OrBorTor Office.
https://teakdoor.com/images/imported/2018/03/1127.jpg
''lets get straight to it...''
https://teakdoor.com/images/imported/2018/03/1128.jpg
https://teakdoor.com/images/imported/2018/03/1129.jpg
https://teakdoor.com/images/imported/2018/03/1130.jpg
'so...this bit is the ''downstairs-outside-under-shade 'bit', is it?...''
https://teakdoor.com/images/imported/2018/03/1131.jpg
...'and over here is the West Wing...''
https://teakdoor.com/images/imported/2018/03/1132.jpg
K.Pot: ''Apparently, he calls this bit the 'study/office' but it might be retreat or man-cave or hidey-hole... he's specified a lock on the inside and a hidden booze cupboard, anyway...''
K.Ek: ''interesting...very interesting...''
https://teakdoor.com/images/imported/2018/03/1133.jpg
"'OK gents... looking good... can you crack on 'cos me and those lovely PEA ladies have all got invites to the pool-party when its finished....''
Ground floor plumbing
https://teakdoor.com/images/imported/2018/03/1115.jpg
https://teakdoor.com/images/imported/2018/03/1116.jpg
https://teakdoor.com/images/imported/2018/03/1117.jpg
https://teakdoor.com/images/imported/2018/03/1118.jpg
https://teakdoor.com/images/imported/2018/03/1119.jpg
https://teakdoor.com/images/imported/2018/03/1120.jpg
https://teakdoor.com/images/imported/2018/03/1121.jpg
https://teakdoor.com/images/imported/2018/03/1122.jpg
https://teakdoor.com/images/imported/2018/03/1123.jpg
https://teakdoor.com/images/imported/2018/03/1124.jpg
https://teakdoor.com/images/imported/2018/03/1125.jpg
Lol...hopefully, all of the above means something to someone - I am not a plumbing expert, so I'm relying on the original plans and K.Pot's ability to follow them.
I think its the right colour anyway. Oh... and its in the ground below the floor so I think thats right too...
Dunno if I will be able to post the photos and numerous videos from that still-some-way-off pool party, Norton cos strictly speaking it's fu... nothing to do with the building thread, and it might incriminate government officials...
PEA soup..mmm mmmm... its a winner. Mushy PEA's not bad either. Not so keen on processed PEAs. I didnt see any marrow fat PEA's when I was there...
Fitting the Duct Banks
https://teakdoor.com/images/imported/2018/03/1108.jpg
https://teakdoor.com/images/imported/2018/03/1109.jpg
https://teakdoor.com/images/imported/2018/03/1110.jpg
https://teakdoor.com/images/imported/2018/03/1111.jpg
https://teakdoor.com/images/imported/2018/03/1112.jpg
https://teakdoor.com/images/imported/2018/03/1113.jpg
https://teakdoor.com/images/imported/2018/03/1114.jpg
Another job completed...
Pouring the ground floor columns
https://teakdoor.com/images/imported/2018/03/1105.jpg
In the time-honoured way...
https://teakdoor.com/images/imported/2018/03/1106.jpg
Plenty of supports used.
https://teakdoor.com/images/imported/2018/03/1107.jpg
Soon my cages will have fattened up and metamorphosed into ... RC columns!!
Not got too many pics of this.. but we have all seen concrete being poured into columns, right!?
Only got video of this bit
I've never read of anybody installing something like this in a Thai build ...I'm guessing you intend to use a pressure switch mounted on the window frame to turn off the A/C ? or something more hi-tech ? Each and every window ? Somchai the sparky is going to love that !
ha yeah Mike... I wondered if anyone would spot that!! I get carried away sometimes with 1001 ideas popping up all the time. Seemed like a good idea when I wrote it down but as you point out, probably not practical. maybe a pressure switch tho.... lol joking. oh wait... a motion sensor? maybe... but not in the lounge or bedrooms... damn! ...more work needed.
BTW...I have rejected / dismissed so many ideas before we got to the plans, contract and now the build.
That pic was about the windows opening inwards to allow for traditional working shutters.
Ha! I better not upload ALL my scribbles or I might get moved to the 'loony section'....
Thanks for that, David... I'm not 100% up to speed with every belief, superstition, spirit requirement and such like. but quickly checking... the house is at an angle to these proposed gates so cannot create an exit freeway!! Access point upstairs is not aligned with anything on the opposite side. Door below is not aligned with access above. kitchen access is at right angles to all the rest. dining room windows (a 4M opening on 2 sides, again not aligned with anything. even the opposite boundary wall pedestrian gate is not lined up with those proposed main gates.
So ...I think I am 'OK'....
Thanks for the post though...it's just the sort of thing I would miss.
We have 2 rai of flat land by a rural road in Nongbualamphu. A quiet area.
After many iterations, we still haven't agreed an outline plan that we want to give the architect. Having toyed with two-storeyed ideas, I think maybe I'll not want stairs 20 years from now. So probably a fairly modest single storey with 2 or 3 bedrooms and a relatively large covered verandah to the rear, from where I can sit and watch the trees grow.
The timeline was supposed to be adding some landfill during this dry season and cracking on with construction the next. Things are already running behind plan, so probably filling at the end of this year and building another year on. I'm in no rush.
BTW I'd love to send you a 'green' for kicking off this thread, but I have yet to figure out how to do that. Not even sure that I am graced with that privilege yet.
Good luck with your build. It does seem to be going particularly well so far.
Similar to Thai ideas, the Chinese view of feng shui is that evil spirits travel in straight lines, so they like to put a little wriggle into the driveway and the pathway to ensure that those pesky spirits cannot zoom straight up the drive and into your front door. I'm less clear about Thai beliefs but it is probably best to plan that the gates are offset relative to the house doors and then have your local cultural advisor approve in advance.