    The BTS/MRT Under Construction thread

    I'm making a point of taking several photos of the construction, as it will eventually make a collection of interesting 'then & now' pictures.

    BTS Green line extending north to Saphan Mai, and eventually Lam Lukka, if this map is anything to go by.



    I'm a rail fan, and was quite upset by the closure of the rail museum next to Chatuchak Park last year. Ok it wasn't the most well kept place but nice to know there are some fellow enthusiasts in this city. I would imagine the place shut due to lack of interest and funding. Trends come and go fast nowadays.

    The first stop north of Mo Chit will be called Lat Phrao Intersection, not Horwang as shown on that map. Horwang would be more apt as it's next to both Soi Horwang and Horwang school.

    Here are a few pictures of the current construction site around Central Lat Phrao.


    On the footbridge looking towards Ratchayotin at dusk, quite a romantic shot


    Same footbridge but looking the other way towards Chatuchak. A lot of building going on. This was taken about 30mins before the first picture.


    The path of the line towards the Elephant building & Ratchayotin, supporting pillars can be seen quite clearly




    These pics show the site of the new station complex.


    Work in progress


    Workers on site below the footbridge that leads into the Union Mall. Further on from this footbridge are several flyovers which may mean the line rising several metres further than standard height to clear these obstacles. Unlike the Ratchayotin flyover, I can't see them demolishing all those. But you never know.

    The next lot of photos will be on the site of Ratchayotin Station, further north. Then after that I will follow the route of the line and hopefully this will make a fine collection.

    I was quite surprised by the lack of decent pictures showing the original skytrain being built in the 90s, so I'm making a point of taking these.

  2. #2
    Thailand Expat klong toey's Avatar
    Join Date
    Oct 2008
    Last Online
    @
    Posts
    6,400
    Don't forget about what happened the other day.


    http://www.khaosodenglish.com/news/c...ure-falls-car/

  3. #3
    Thailand Expat
    wasabi's Avatar
    Join Date
    Dec 2012
    Last Online
    28-10-2019 @ 03:54 AM
    Location
    England
    Posts
    10,940
    How many years of construction still to go?

  4. #4
    Being chased by sloths DJ Pat's Avatar
    Join Date
    Jul 2005
    Last Online
    @
    Posts
    18,765
    Hardly surprising to be honest, Ital Thai haven't had a good month so far.

    But that artcle gives the link to something I was wondering at the end of the top post:

    Further on from this footbridge are several flyovers which may mean the line rising several metres further than standard height to clear these obstacles. Unlike the Ratchayotin flyover, I can't see them demolishing all those. But you never know.
    Oh well this is the answer from the article:
    BANGKOK — Construction of a bridge between BTS Mo Chit and a new elevated train line will begin in February, a director of the project said Monday.
    To avoid closing down traffic at one of the busiest crossroads in the capital, the Green Line extension’s tracks will soar over the tangle of crisscrossing bridges and expressways at Lat Phrao intersection, according to Surachet Laophulsuk of the Mass Rapid Transit Authority, or MRTA, which is building the extension.
    “It will slightly affect the traffic, but we won’t shut down the entire intersection,” Surachet said. “We might close down just one lane.”
    Dismissing reports on social media that Lat Phrao intersection will be closed during construction, Surachet said the MRTA would take lessons learned late last year from dismantling the Ratchayotin Intersection overpass without interfering with the traffic.

    “It’s like what we did at Ratchayothin. Let me stress my point: We won’t close down the intersection,” Surachet said.


    Starting just north of the three-way intersection, the elevated Green Line will connect Bangkok’s downtown with its northern suburbs. The MRTA hopes to connect its southern terminus at what will be the Lat Phrao Station to BTS Mo Chit, which is just south of the intersection, by August 2018.

    The Green Line itself will be finished by February 2019, but when it begins operating depends on negotiations with Bangkok City Hall, Surachet said.
    The flyover across Lat Phrao intersection will run 26 meters above the ground, a height of about eight floors, making it one of the tallest rail spans ever built in Thailand, he added.




    Green Line Link to BTS Mo Chit Won?t Close Lat Phrao Intersection
    Last edited by DJ Pat; 24-03-2017 at 01:20 AM.

  5. #5
    Being chased by sloths DJ Pat's Avatar
    Join Date
    Jul 2005
    Last Online
    @
    Posts
    18,765
    Amendments to the BTS maps in stations as of the last few days...

    I was told by the staff that Mo Chit station may be relocated 100m further north at a higher level to prepare for the elevated structure that will take the line 26m up over the Lt Phrao intersection. Trains will be get turned around at Saphan Kwai during that time.

    Sena Ruam station will finally get built and the extension will run as far as Lat Phrao until the whole line is complete.



    At the south end, Samrong will be open in the next couple of months and rather than amend and replace the map again, the extension south is now shown.




  6. #6
    I'm a pain in the arse
    Immigrunt's Avatar
    Join Date
    Apr 2016
    Last Online
    @
    Posts
    1,319
    You should take a 522 expressway bus from victory monument up the expressway past bang sue to rangsit to get a great birds eye view of the new Bangkok Station. The construction site is huge and takes several minutes to pass through even at expressway speed.

  7. #7
    Being chased by sloths DJ Pat's Avatar
    Join Date
    Jul 2005
    Last Online
    @
    Posts
    18,765
    I did go past that last week and they've cleared more land for the whole complex.





    I took a load of pics of the station progress as of last September too, from the train heading to Hua Hin.





  8. #8
    Thailand Expat
    wasabi's Avatar
    Join Date
    Dec 2012
    Last Online
    28-10-2019 @ 03:54 AM
    Location
    England
    Posts
    10,940
    Are they nearly finished?

  9. #9
    Being chased by sloths DJ Pat's Avatar
    Join Date
    Jul 2005
    Last Online
    @
    Posts
    18,765
    Our train also ran alongside the currently mothballed SRT Light red rine heading west to Phuttamonton







    Maybe it will be operational when the Bang Sue terminal is complete, as this future map shows: (in light red)


    Last edited by DJ Pat; 26-03-2017 at 10:16 PM.

  10. #10
    Being chased by sloths DJ Pat's Avatar
    Join Date
    Jul 2005
    Last Online
    @
    Posts
    18,765


    A year ago I shot a video on the way to Don Muang which shows the progress of the SRT Red Line heading north. From that video I gathered these construction pics: (these pics are in no particular order)













    The line will run alongside Miracle Grand



    Laksi IT Square












  11. #11
    Thailand Expat
    wasabi's Avatar
    Join Date
    Dec 2012
    Last Online
    28-10-2019 @ 03:54 AM
    Location
    England
    Posts
    10,940
    Every time I drive into London the skyline is different, so many new buildings going up.

  12. #12
    Being chased by sloths DJ Pat's Avatar
    Join Date
    Jul 2005
    Last Online
    @
    Posts
    18,765
    Quote Originally Posted by wasabi View Post
    How many years of construction still to go?

    Nobody knows, it's all ongoing of course.



    The Green Tea Line Channel

    Here are several videos on the construction progress, including each of the new stations north of Mo Chit. Worth a look if you have time.

    https://www.youtube.com/channel/UCzk...LVKR5cbf4moXHw

  13. #13
    Being chased by sloths DJ Pat's Avatar
    Join Date
    Jul 2005
    Last Online
    @
    Posts
    18,765
    Definitely an ambitious project, worth a look though.




    The High Speed rail system (Bangkok - Nakhon Ratchasima - Nong Khai Line) A major transport infrastructure project that the government is pushing through with the aims helping the boost development in northeastern Thailand

  14. #14
    Newbie

    Join Date
    May 2014
    Last Online
    25-09-2022 @ 09:45 AM
    Location
    Woop woop
    Posts
    30
    DJ , I enjoy your posts on the train system . So please continue . Thanks .

  15. #15
    Thailand Expat
    Gazza's Avatar
    Join Date
    Mar 2006
    Last Online
    @
    Location
    Wat Thafookhisit near to Wat Chamakhorlit
    Posts
    2,314
    I don't think much of the design of the stairways of these stations from Bangkhen to Don Muang.

    They are open far too much to the elements. The slightest bit of rain with the slightest bit of breeze and the steel steps are going to be damned slippy. Not to mention getting soaked and eyes poked out from umbrellas of people a step or two in front of you.



  16. #16
    Being chased by sloths DJ Pat's Avatar
    Join Date
    Jul 2005
    Last Online
    @
    Posts
    18,765
    The scene yesterday, the first pillar going up, slowly..Operational by 2018?


  17. #17
    Newbie
    Join Date
    Apr 2017
    Last Online
    21-10-2018 @ 04:20 PM
    Location
    bangkok
    Posts
    6
    What will be the differance between the red line and the green line at Don Mueng ?
    From the red line it looks like a good walk but I thought i saw a map where the green line was supose to connect.


    Never mind as a look at the map and saw green line going behind the airport.... still like to know how they will get people over expressway from red line.
    Last edited by soi23; 20-04-2017 at 08:30 AM.

  18. #18
    Custom Title Changer
    Topper's Avatar
    Join Date
    Dec 2007
    Last Online
    Today @ 10:40 PM
    Location
    Bangkok
    Posts
    12,124
    Quote Originally Posted by DJ Pat
    Operational by 2018?
    Maybe 2028.....

  19. #19
    Thailand Expat VocalNeal's Avatar
    Join Date
    Jul 2007
    Last Online
    Today @ 10:41 PM
    Location
    The Kingdom of Lanna
    Posts
    12,992
    I'm a rail fan
    Next time you are out and about you might like this restaurant?

    https://goo.gl/maps/7QAcryPEu8G2

    It is 50m off Rot Fai 1 Alley Bang Sue. More atmospheric than artifactual . But if you are nearby?

    Pictures of old trains etc on the walls. I guess it is where rail workers go/used to go.
    Better to think inside the pub, than outside the box?
    I apologize if any offence was caused. unless it was intended.
    You people, you think I know feck nothing; I tell you: I know feck all
    Those who cannot change their mind, cannot change anything.

  20. #20
    Being chased by sloths DJ Pat's Avatar
    Join Date
    Jul 2005
    Last Online
    @
    Posts
    18,765
    Thread bump the same time I am going through a few of the latest construction progress videos.

    Good timing.

    Quote Originally Posted by VocalNeal
    Pictures of old trains etc on the walls. I guess it is where rail workers go/used to go.
    I hope the prices reflect this, it is my kind of place and I'm not too far away...Pics will follow soon. Cheers.

  21. #21
    Thailand Expat VocalNeal's Avatar
    Join Date
    Jul 2007
    Last Online
    Today @ 10:41 PM
    Location
    The Kingdom of Lanna
    Posts
    12,992
    Did you ever get there?

  22. #22
    Being chased by sloths DJ Pat's Avatar
    Join Date
    Jul 2005
    Last Online
    @
    Posts
    18,765
    Station N10, Ratchayotin and further north along Phahon Yothin Road to N12, Sena Nikhom


    Construction around and next to Major Ratchayotin, ongoing. They've slated it as opening within 2yrs, which looks a bit distant.



    Looking back towards Lat Phrao









    Just before the interesection where they flyover was removed









    Last edited by DJ Pat; 01-05-2017 at 04:51 PM.

  23. #23
    Being chased by sloths DJ Pat's Avatar
    Join Date
    Jul 2005
    Last Online
    @
    Posts
    18,765
    N12, Sena Nikhom











    Looking back as the elephant building gets smaller and further away




    Turn around and look 'north'






    Last edited by DJ Pat; 01-05-2017 at 05:11 PM.

  24. #24
    Custom Title Changer
    Topper's Avatar
    Join Date
    Dec 2007
    Last Online
    Today @ 10:40 PM
    Location
    Bangkok
    Posts
    12,124
    Two years does seem optimistic....

  25. #25
    R.I.P. Luigi's Avatar
    Join Date
    Dec 2014
    Last Online
    @
    Location
    Abuja
    Posts
    26,213
    Thai time.

    Quote Originally Posted by soi23 View Post
    What will be the differance between the red line and the green line at Don Mueng ?
    From the red line it looks like a good walk but I thought i saw a map where the green line was supose to connect.


    Never mind as a look at the map and saw green line going behind the airport.... still like to know how they will get people over expressway from red line.
    They won't.

    The green line is the BTS.

    The red line is a different system - SRT, Elevated Railway. Running from the terminal being built in Bang Sue.

Page 1 of 6 123456 LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •