The 1 meter retaining wall has been completed to contain the fill dirt and red brick filler continues around the house.
https://teakdoor.com/Gallery/albums/u...5284/002~1.JPG
The steel for the back patio is being cut and welded. The little lady keeps a watchful eye on things while her Thai kitchen gets more red brick at the back of the house. There will be a door on each side of the kitchen, one leading down to a wash area and on the other side toward the pool table and entertainment area. I am dreading the trip to the roofing company to order the steel roof panels since there must be well over 600m2 to cover. I will give you an exact fugure once all the measurements are made. The roof will be the most expensive part of this build, but I think it is a part of the house that needs the most effort along with the foundation.
https://teakdoor.com/Gallery/albums/u...5284/003~3.JPG
Another angle of the red brick and back patio steel.
https://teakdoor.com/Gallery/albums/u...5284/001~1.JPG