![]() |
| |||||||
| Construction in Thailand Is building in Thailand as bad as it seems? Can properties really be built and fitted out to European standards? Would you like to Build your own house in Phuket, or a swimming pool in Bangkok? Solar water heating in Pattaya? Or maybe you want to build a resort or guesthouse on Koh Samui? If you want to build a luxury house in Thailand then this is the forum for you. |
|
| | LinkBack | Thread Tools | Search this Thread | Display Modes |
| | #1 (permalink) |
| Ratchaburi Last Online: 20-11-2009 09:53 AM Join Date: Apr 2007 Location: at home
Posts: 487
| Raising land - questions questions questions We have some land that needs to be raised some. The situation is like this: ![]() So the land is not any lower than other land around it, but it's considerably lower than a road and small irrigation canal alongside it. It's about 1.5 meters below that. While we probably won't raise the entire land area to the same level as the road, we should probably raise the area where the house is going to be by at least 1.50m and probably by 2m. (Does anyone know the typical cost to raise about 1 ngan or so by 2 meters?) Of course the land needs time to settle, probably at least a year. So I was thinking, would the following be possible: Put in the house footings at the current level and make the posts higher by 1.5-2 meters, then fill up the land afterwards so the footings are in solid soil, and go on from there? So like this: ![]() As opposed to this: ![]() Would the former be a lot more expensive, and is it worthwhile to do? Is the added cost just the extra length for the concrete poles? Last edited by WhiteLotusLane : 22-06-2009 at 02:01 PM. |
| | |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | Search this Thread |
| Display Modes | |
| |