    While i was back in Thailand for 2.5 weeks, after the airport construction contract came to an end, we met with, interviewed and checked out ,and ultimately rejected all but 1 of 7 builder possibilities. Hugely differing levels of interest, of course wild variations in the prices (!), with one confidently stating that it could not be done for less than 20M - I think he had been out in the sun too long (rejected of course)

    It came down to 2 - one had a lot of temple building experience which i thought might be a good option for the roof requirements, both were experienced in creating the wood look using mortar (we saw samples of both their work and it was excellent), the second one was cheaper and available and had his own piling equipment, so we did not need the external piling contractor + plus that meant he was 100% responsible for 100% of the build. he was also based nearer to the project site.

    so... builder no.2...come on down.. the price is right! (oh...and you some work to do)

  2. #377
    Freelance Astronaut
    Thai Dhupp's Avatar
    Join Date
    Sep 2016
    Last Online
    23-02-2024 @ 12:36 AM
    Location
    Thailand...just Thailand!
    Posts
    2,103
    when will it all start, i think i heard asked (!)?

    OK...if you look back at earlier posts i always said... not til December time at the earliest. We wanted the raised ground to settle as much as possible and also the rains to finish for the year. also... as mentioned...I'm not there. so its still looking like end of the year to start the works.

  3. #378
    Freelance Astronaut
    Thai Dhupp's Avatar
    Join Date
    Sep 2016
    Last Online
    23-02-2024 @ 12:36 AM
    Location
    Thailand...just Thailand!
    Posts
    2,103
    OK...here i am asking questions again!

    we are now near to engaging the 'chosen one', and so the subject of contracts has raised its head.

    What to put in? What is absolutely essential? How to stage the payments? Penalties? etc,etc...

    I have already had one sample contract from Norton (thanks for it!) which was v useful and so i wanted to ask the rest of you what experiences you had with drafting contracts, what you maybe wished you had included, what is not important, and so on.

    All replies gratefully received on what is I think an important part of the build?
    Last edited by Thai Dhupp; 08-11-2017 at 04:12 PM.

  4. #379
    Member

    Join Date
    Jun 2016
    Last Online
    27-03-2023 @ 04:17 PM
    Posts
    265
    My contract was in Thai, but we thrashed out the agreement verbally first, and then was assured by the missus that the content was correct when it came to signing (she is pretty good at this sort of thing). What I would say from my experience is to insist that the foreman/builder has a notebook on-site with him at all times, and any direction/request/point of note/complaint/error in construction etc should be entered, dated and signed for.

    I made several requests at numerous times during my build for some features to be included and these multiple requests were accepted and agreed and then promptly ignored, only after my constant badgering and at a very late stage in the build were then actioned, but by then the end results weren't as expected as the features were not put in at the correct time during the construction process. Being informal works for some things, but not for others... If I had insisted that the procedure was a bit more formal by using a report book, then the build would have gone much smoother.

    Payments were made in instalments, 20% deposit and for foundations and footings , 20% for concrete work for house base, 20% for steelwork, roofing and walls, 20% for tiling, windows, doors and interiors...10% for wiring and plumbing and fittings etc. The final payment of 10% was withheld for one month as security against any possible major fixes that needed doing (but I'd suggest making this 20% withheld for 2-3 months with your build as it's more complicated and extensive than mine was).

    I don't think insisting on a penalty clause for late completion will work outside of Bangkok, or if building a large resort somewhere, it's more relevant to commercial builds... Inclusion of a penalty clause might just force the team to panic and start taking shortcuts with the build (which will happen to some extent anyway, so no need to make matters worse!). Additionally, I think inclusion of a penalty may result in an unfinished build. Despite what may be agreed at the beginning, if the builder suspects he's going to face financial difficulty because of some arbitrary deadline he's definitely going to overshoot (I'd allow 15% extra time on what is agreed), he'll just abandon the build at 80%. Then you'll be faced with trying to find another team to finish off the work when most of the funds (and thus profit) have been used up. This can (and does) happen very often all over the world.

  5. #380
    Freelance Astronaut
    Thai Dhupp's Avatar
    Join Date
    Sep 2016
    Last Online
    23-02-2024 @ 12:36 AM
    Location
    Thailand...just Thailand!
    Posts
    2,103
    That all good advice Jonny - thanks for jumping with a reply so swiftly!

    I tend to agree about the penalty clause too. given that deadlines do'slip' ...no point in over-pressurising the situation.

    Holding the last 15 or 20% like you suggested, is a sort of penalty to complete at around the agreed time and to a standard anyway - no need to load it up any more I think.

    Others might have a different take on it though...?

    Thanks again.

  6. #381
    Thailand Expat

    Join Date
    Mar 2015
    Last Online
    @
    Posts
    15,541
    Just make sure the 15-20% withheld is withheld for x amount of time after provisional sign-off, not for x amount of time from agreed deadline.

  7. #382
    Freelance Astronaut
    Thai Dhupp's Avatar
    Join Date
    Sep 2016
    Last Online
    23-02-2024 @ 12:36 AM
    Location
    Thailand...just Thailand!
    Posts
    2,103
    Good point Maanaam and one that, I'm sure is easily overlooked.

    Thanks for the input

  8. #383
    Days Work Done! Norton's Avatar
    Join Date
    Oct 2007
    Last Online
    Today @ 02:10 PM
    Location
    Roiet
    Posts
    34,939
    Quote Originally Posted by jonnyenglish View Post
    20% deposit and for foundations and footings , 20% for concrete work for house base, 20% for steelwork, roofing and walls, 20% for tiling, windows, doors and interiors...10% for wiring and plumbing and fittings etc. The final payment of 10% was withheld for one month as security against any possible major fixes that needed doing
    Pretty much standard.

    Make sure the house plans are referenced as the build to requirements and attached as part of the contract.

    House plans need to go into detail on all materials. Specifics on cement, steel, flooring, electrics, plumbing and fixtures. I even had manufacturer and model numbers for near all fixtures.

    Will take some work but if ysou cost out the materials and make a SWAG on labor you will get a good should cost. I did this for my house and added 20% profit for the builder.

    Hard to be definitive on workmanship and quality so as I mentioned earlier, go look at previous builds the builder did. That's what you will get.
    Last edited by Norton; 09-11-2017 at 05:06 PM.
    "Whenever you find yourself on the side of the majority, it is time to pause and reflect,"

  9. #384
    Days Work Done! Norton's Avatar
    Join Date
    Oct 2007
    Last Online
    Today @ 02:10 PM
    Location
    Roiet
    Posts
    34,939
    One more I forgot. Contract clause that says the builder is responsible for removing all building debris from the property.

  10. #385
    กงเกวียนกำเกวียน HuangLao's Avatar
    Join Date
    Jun 2017
    Last Online
    @
    Location
    สุโขทัย
    Posts
    10,149
    Quote Originally Posted by Norton View Post
    One more I forgot. Contract clause that says the builder is responsible for removing all building debris from the property.
    Most assuredly.
    As this character is built into Thai DNA. Leaving a mess and allowing most everything to lie about without consciousness of responsibility thereof.

    Imperative that such firm agreements are adhered to or they'll just let it go.
    Preferably, cleaning and removing as they go - instead of when job is finished.

  11. #386
    Freelance Astronaut
    Thai Dhupp's Avatar
    Join Date
    Sep 2016
    Last Online
    23-02-2024 @ 12:36 AM
    Location
    Thailand...just Thailand!
    Posts
    2,103
    Quote Originally Posted by Norton View Post
    Pretty much standard.

    Make sure the house plans are referenced as the build to requirements and attached as part of the contract.

    House plans need to go into detail on all materials. Specifics on cement, steel, flooring, electrics, plumbing and fixtures. I even had manufacturer and model numbers for near all fixtures.

    Will take some work but if ysou cost out the materials and make a SWAG on labor you will get a good should cost. I did this for my house and added 20% profit for the builder.

    Hard to be definitive on workmanship and quality so as I mentioned earlier, go look at previous builds the builder did. That's what you will get.
    Good advice as always, Norton... we saw the quality of the two shortlisted candidates, both good. I have confidence in our final selection ...time will tell.

    Yeah... I started thinking about including specifics too for the key items and methods in the document, but some smaller requirements too. (the floor tile design and colour in the lower entrance is one such). As you said, takes time but makes it clear to everyone so definitely worth it as long as they then follow what's agreed!.

    Thanks for the contribution.

  12. #387
    Freelance Astronaut
    Thai Dhupp's Avatar
    Join Date
    Sep 2016
    Last Online
    23-02-2024 @ 12:36 AM
    Location
    Thailand...just Thailand!
    Posts
    2,103
    Quote Originally Posted by Norton View Post
    One more I forgot. Contract clause that says the builder is responsible for removing all building debris from the property.
    Quote Originally Posted by HuangLao View Post
    Most assuredly.
    As this character is built into Thai DNA. Leaving a mess and allowing most everything to lie about without consciousness of responsibility thereof.

    Imperative that such firm agreements are adhered to or they'll just let it go.
    Preferably, cleaning and removing as they go - instead of when job is finished.
    Well...I'm a firm believer in 'a little and often', but let's not talk about that...

    ...instead, 'clean up as you go' -most definitely!! Norton and HuangLao... another important inclusion and again maybe one that gets forgotten in the excitement of 'building the dream'... thanks guys!

  13. #388
    Freelance Astronaut
    Thai Dhupp's Avatar
    Join Date
    Sep 2016
    Last Online
    23-02-2024 @ 12:36 AM
    Location
    Thailand...just Thailand!
    Posts
    2,103
    OK here I am back again (sorry its been a long time) and I've got the draft of the sort of contract I'm envisaging. No doubt though, I've missed something (!) and hopefully you will tell me so (!!) . ..anyway here it is :

    Does it look about right?
    Is it too much?
    What glaring omission have i made?

    It will be translated into Thai of course.

    We are v close to signing the builder now (I'm home in January) so I want to get this right so that there is no delay with him.

  14. #389
    Freelance Astronaut
    Thai Dhupp's Avatar
    Join Date
    Sep 2016
    Last Online
    23-02-2024 @ 12:36 AM
    Location
    Thailand...just Thailand!
    Posts
    2,103
    CONTRACT FOR CONSTRUCTION
    สัญญาเพื่อการก่อสร้าง

    1. This contract is made on Day…………. Month …………. Year ………….

    2. This contract is made between ……………………………………………………., referred to as ‘The

    Employer’ and ……………………………………………., referred to as ‘The Contractor’ who is located

    at ……………………………………………………………………………

    3. The Contractor is contracted to build a 2-storey Thai Style (Lanna / Ayutthaya) house, exactly following the approved plans provided by The Employer

    4. The contract shall strictly follow the details in the approved plan 62/2559, issued from Orbortor Office in ………………………………………………………………………


    5. The house to be built is in the traditional Thai style (Lanna / Ayutthaya)

    6. The house to be built will be constructed in a similar way to a house that is built at 15 / 194, Moo 3, Ban Suan, Muang, Chonburi, including but not limited to pile foundations, concrete ground and first floor ring beams, reinforced concrete frame and in-fill, non-load bearing walls, doors and windows, all under a metal truss, reflective insulation and cement-tiled roof and with integral plumbing, waste water and electrical systems.

    7. The house construction is divided into 3 Zones - A, B and C.

    8. This contract covers the piling of zones A, B and C, and the construction of the house in zones A and B.

    9. The total sum, including Labour and materials for the piling in zones A, B and C, and construction of the house in zones A and B is X, XXX, XXX

    10. The construction time shall follow a strict timetable, commencing from the agreed start date.

  15. #390
    Freelance Astronaut
    Thai Dhupp's Avatar
    Join Date
    Sep 2016
    Last Online
    23-02-2024 @ 12:36 AM
    Location
    Thailand...just Thailand!
    Posts
    2,103
    Construction Detail
    รายละเอียดงานก่อสร้าง

    11. The agreed starting date is …………………….


    12. The approved plans shall be accurately followed at all times.

    13. Any proposed changes to the plan by The Contractor shall be agreed with The Employer BEFORE they are implemented.

    14. All concrete used in the construction of the house shall follow the agreed blend to maintain the strength of the concrete and cement powder shall not be reduced or substituted with PFA or other non-reactive ingredients.

    15. Concrete for the floor slab on each level must not be flooded with additional water to make it more workable as this causes separation of the particulate and cement fines resulting in a weakened slab.

    16. The rebar mesh re-enforcing within the floor slabs must be raised into the middle of the slab before the concrete is poured by using sufficient concrete ‘chairs’ to support the mesh, so that it can provide maximum slab strength.

    17. External walls shall be 150mm Q-con AAC blocks or equivalent

    18. Internal walls shall be 100mm Q-con AAC blocks or equivalent

    19. Diamond pattern Roof Tiles shall be SCG Classic Ayara or equivalent, size and colour to be agreed when the roof is ready to be tiled.

    20. Doors and window frames will be of treated wooden construction to repel termites.

    21. All window openings shall have glazed windows that open inwards, and wooden shutters that open outwards

    22. Skirting boards in all rooms shall be constructed from wood which has been treated to repel termites

    23. Piles shall follow the pile plan and this will require a larger cross-section pile in some locations to support the first floor and roof. Calculations have been approved to confirm this requirement

    24. Re-enforced Concrete frame for the upper floor and roof will require a larger cross-section in some rooms (in other words, it will be bigger) where the dimensions between the columns in the room are more than 4m x 4m, to support the larger dimensions of those rooms. Calculations have been approved to support this requirement.

    25. The contract shall include all electrical materials and labour for Zones A and B. If the Employer wishes to fit a better light or switch unit than is in the budget, The Employer will provide an additional sum of money, being the difference in cost for the switch or light unit that is required

    26. The electrical plans (within approved plans 62/2559) shall be followed exactly. The type and number of electrical sockets shown in the approved plans in each room must not be reduced and the socket locations must not be altered.

    27. Some light switches work of a 2-switch system (e.g. top and bottom of the staircase) and these 2 switch arrangements shall be followed exactly.

    28. The contract shall include all materials and labour for the plumbing and connections in all bathrooms and the kitchen, apart from the kitchen and bathroom appliances and furniture (toilets, showers, baths, sinks)

    29. All drains from toilets and sinks shall include a U-bend in the system to prevent odour from coming back up the drain pipes and into the house

    30. For all waste pipes, the Contractor shall accurately calculate the correct fall (inclination) of the pipe to give optimum removal of wastes, particularly black water (sewage) wastes. All waste pipes shall be accurately installed as per those calculations

    31. The contract shall include labour only for the fitment of the kitchen. The kitchen shall be purchased separately by The Employer.

    32. A sum is included for materials and labour for all flooring. If different flooring is preferred by The Employer, an additional sum of money equivalent to the difference in the cost of that flooring material shall be paid. Labour cost shall not change.

    33. The contract includes air-conditioning in all rooms apart from the bath/shower rooms, the Buddha room and entrance halls. Air-conditioning units shall be specified to adequately cool those rooms after assessment of the room volume and the insulation properties of the construction.

    34. This contract includes the construction of a wooden Sala, leading from the ground level up to the second floor of zone B. The design of this Sala is clearly detailed in the approved plans 62 / 2550 and will be followed exactly

    35. The contract includes floor finishing for the balcony / terrace on the second floor of zone B, outside the living room area. A sum for flooring shall be included and if The Employer wants to fit different or better flooring, the difference in the cost of that flooring shall be paid by The Employer. The labour cost shall remain the same.

    36. Although it is not shown on the approved plans, there is 1 additional bathroom under the internal staircase, accessed from the office. There is a supplementary plan detail for this. This was discussed and agreed as part of the contract scope during the meeting between The Employer and The Contractor
    Last edited by Thai Dhupp; 13-12-2017 at 05:40 PM.

  16. #391
    Freelance Astronaut
    Thai Dhupp's Avatar
    Join Date
    Sep 2016
    Last Online
    23-02-2024 @ 12:36 AM
    Location
    Thailand...just Thailand!
    Posts
    2,103
    The Division of the Work (stages and payments) – guideline only, not 100% inclusive
    ส่วนงาน (ขั้นตอนและการชำระเงิน) - เป็นแนวทางเท่านั้นไม่รวมถึง 100%

    37. Stage 1 Piling work: drilling, piling for zone A, B and C with piles being placed through the soft upper strata and resting on the firm lower strata layer, approx. 7m down, pile cropping as required, pile caps and also including a sizable advance on payments to assist in the setup of the site for the rest of the work
    Cost: xxx, xxx THB

    38. Stage 2: ground floor: ground floor and ground floor columns for zone A and B, including the ring beam, in-fill, concrete planks and slab, all necessary water, waste and electrical conduits, greywater tank, septic tank / secondary tank arrangements, pipework to drain field, first floor columns
    Cost: xxx, xxx THB

    39. Stage 3 1st floor: ring beam, second floor concrete planks and slab, second floor columns, all necessary water, waste and electrical conduits, staircase installation, recessed concrete floors for all bathrooms, showers, toilets, use of waterproof additive for bathrooms/shower rooms.
    Cost: xxx, xxx THB

    40. Stage 4 roof structural work: installation of trusses
    Cost: xxx, xxx THB:

    41. Stage 5 Roof: installation of insulation and tiles, roof gable ends, vents, ceiling panels, all electrical cabling for lighting, air-conditioning, electrical switching, internet
    Cost: xxx, xxx THB

    42. Stage 6: exterior Wall work: 150mm AAC blockwork, window and door frames, windows, doors, render, wood impression decoration to 2st floor exterior walls to look like Lanna wooden detail, Sala construction, Air-conditioning installation
    Cost: xxx, xxx THB

    43. Stage 7 interior secondary work: interior 100mm AAC blockwork walls, wall rendering, skirting boards, Ceilings, plastering, tiling to all floors, tiling to bathrooms, kitchen etc
    Cost: xxx, xxx THB

    44. Stage 8 finish: wall painting, wood staining, bathroom, kitchen installation
    Cost: xxx, xxx THB

    45. Stage 9 Final Payment: (xxx, xxx%) to be made 6 weeks after final completion date to allow for snagging list completion
    Cost xxx, xxx

    46.Total cost: xxx, xxx

  17. #392
    Freelance Astronaut
    Thai Dhupp's Avatar
    Join Date
    Sep 2016
    Last Online
    23-02-2024 @ 12:36 AM
    Location
    Thailand...just Thailand!
    Posts
    2,103
    Changes to Contract
    การเปลี่ยนแปลงสัญญา

    47. The employer must notify the Contractor of any changes within 7 days of any work being carried out.

    48. Likewise, the Contractor may not make any changes to the approved contract unless agreement to the change has been given in writing, and signed by the employer

    49. The Employer will be responsible for any additional costs incurred due to the changes mentioned in 47. above

    50. Likewise, if the changes result in a reduction in costs, the overall cost of the build will reduce by the amount of the saving.

    51. The Contractor is responsible for any accidents, danger or damage to any person on site, the site itself or any 3rd party caused by the construction or any activities associated with the construction.

    52. The Contractor is responsible for the conduct of all employees during the contract period until the final payment has been made.

    53. The Contractor is responsible for the removal of all construction wastes generated from the project

    54. The Contractor is responsible for general site security for the duration of the build, and will take all necessary precautions to ensure equipment and materials are not removed or stolen from the construction site

  18. #393
    Freelance Astronaut
    Thai Dhupp's Avatar
    Join Date
    Sep 2016
    Last Online
    23-02-2024 @ 12:36 AM
    Location
    Thailand...just Thailand!
    Posts
    2,103
    Supplementary Information

    55. Budget cost /M2 for flooring –

    56. Budget cost /M2 for wall tiles –

    57. Timescale to complete stage 1

    58. Timescale to complete stage 2

    59. Timescale to complete stage 3

    60. Timescale to complete stage 4

    61. Timescale to complete stage 5

    62. Timescale to complete stage 6

    63. Timescale to complete stage 7

    64.Timescale to complete stage 8

    65.Timescale to make final payment: six weeks after completion of Stage 8

  19. #394
    Member

    Join Date
    Jan 2017
    Last Online
    @
    Posts
    520
    Looks like an all-encompassing contract. Well thought out and water-tight. Good job. I guess that now it's very important that it is translated to the word, understood, and agreed upon. Best of luck.

  20. #395
    Days Work Done! Norton's Avatar
    Join Date
    Oct 2007
    Last Online
    Today @ 02:10 PM
    Location
    Roiet
    Posts
    34,939
    Quote Originally Posted by Thai Dhupp View Post
    All drains from toilets and sinks shall include a U-bend in the system to prevent odour from coming back up the drain pipes and into the house
    The traps should be fine but consider venting as well.

    Figuring Out Your Drain-Waste-Vent Lines - dummies

    Contract looks good.

    Quote Originally Posted by Albert Shagnasty2017 View Post
    it's very important that it is translated to the word, understood, and agreed upon
    For sure.

  21. #396
    Member
    Dead Metal's Avatar
    Join Date
    Dec 2012
    Last Online
    01-03-2022 @ 04:52 PM
    Location
    just-behind-you
    Posts
    393
    If its to be a legal translation then its gonna cost. I've been down that road ( UK marriage ) expensive . Yours is a rather large document , ouch .

  22. #397
    Thailand Expat

    Join Date
    Mar 2015
    Last Online
    @
    Posts
    15,541
    Quote Originally Posted by Albert Shagnasty2017 View Post
    water-tight
    Not sure bout that. "...or equivalent." as in 17 and 18 could be a bit open-ended and open to interpretation. I would qualify somehow. Perhaps with "as shown in manufacturer's specs".
    It takes away an opinion-based idea of what "an equivalent" is.

  23. #398
    Days Work Done! Norton's Avatar
    Join Date
    Oct 2007
    Last Online
    Today @ 02:10 PM
    Location
    Roiet
    Posts
    34,939
    Yes. I would leave out "equivalent" in all items. State what you want. In the AAC item Diamond would be an equivalent.

    Best way to elliminate confusion is to have house plans with detail. For example call out Qcon in plan drawing.

    The contract per say should avoid specifying material. By reference from contract the plan drawings should be the build to spec.

    Most important is communication between buyer and seller. Especially for big ticket items such as block, roofing, and flooring. Agree on these before seller purchases and avoid problems.

  24. #399
    Member
    Join Date
    Sep 2007
    Last Online
    Today @ 12:39 PM
    Location
    Ubon Ratchathani
    Posts
    410
    16. The rebar mesh re-enforcing within the floor slabs must be raised into the middle of the slab before the concrete is poured by using sufficient concrete ‘chairs’ to support the mesh, so that it can provide maximum slab strength.
    29. All drains from toilets and sinks shall include a U-bend in the system to prevent odour from coming back up the drain pipes and into the house

    What I have been doing in preparation for our build next year is to collect example photos, good and bad, of these sort of things ....bad ones, ie mesh laying on the ground get a big red X, good ones with plastic sheet underneath and using chairs get a green tick. I intend to reference these pics in our contract as an example, and to have a laminated folder of them on the worksite so the actual workers know what I expect ....a picture is worth a thousand words as they say ...maybe much more when talking to unskilled part-time workers from Myanmar or Cambodia !

  25. #400
    Freelance Astronaut
    Thai Dhupp's Avatar
    Join Date
    Sep 2016
    Last Online
    23-02-2024 @ 12:36 AM
    Location
    Thailand...just Thailand!
    Posts
    2,103
    Quote Originally Posted by Albert Shagnasty2017 View Post
    Looks like an all-encompassing contract. Well thought out and water-tight. Good job. I guess that now it's very important that it is translated to the word, understood, and agreed upon. Best of luck.
    Hi Albert and thanks for stopping by!

    its quite long but because i tried to include err... everything. i guess i have missed some stuff tho.

    Translation shall follow this forum review.

    i think as with all contracts in Thailand, there's only so far you can go, so i'm prepared fro that too.

    thanks again.

Page 16 of 125 FirstFirst ... 6891011121314151617181920212223242666116 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 2 users browsing this thread. (0 members and 2 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •