    I would like to get some opinions and advice on this.

    I have always read where you pour the reinforced concret floor first for a pond and then build up the walls. Lately I have read where sometimes they build the walls first and then pour the floor.

    For information I build with breeze blocks, filled with waterproof concret and then render the walls.

    For the floor I use rebar and concret mixed on site. Then I paint walls and floor with two or more coats of a good leak proof paint.

    I would like to know how they seal between wall and floor and to be able to post the two different articles I found using goggle, but, I can't find them again.

    All coments and advise welcone. Thanks.

  2. #2
    Thailand Expat Pragmatic's Avatar
    Join Date
    Mar 2013
    Last Online
    @
    Location
    Last but who gives a shit.
    Posts
    13,362
    Either way you should put in a cold joint seal.

  3. #3
    Member
    Koetjeka's Avatar
    Join Date
    Aug 2012
    Last Online
    12-11-2015 @ 02:07 AM
    Location
    Chomphra (Surin province)
    Posts
    462
    You will always put the floor before the wall, as this picture illustrates (concrete floor / concrete wall):


  4. #4
    Newbie

    Join Date
    Sep 2013
    Last Online
    09-09-2013 @ 10:32 AM
    Posts
    7
    Everyone has his own query about that but I think it will work either way. What does your contractor recommend you about it ? You should consult some professional rather than searching it on google.

  5. #5
    DRESDEN ZWINGER
    david44's Avatar
    Join Date
    Aug 2011
    Last Online
    @
    Location
    At Large
    Posts
    21,442
    Dew ponds use clay,will you have a natural flow to fill a spring etc?

  6. #6
    Thailand Expat
    DrAndy's Avatar
    Join Date
    Nov 2005
    Last Online
    25-03-2014 @ 05:29 PM
    Location
    yes
    Posts
    32,025
    pour the floor and make sure you have enough irons to link the walls, and make sure you have the special rubber (?) seal in the floor and into the wall

    so half the seal will be in the floor when laid and half will be sticking out ready to be within the wall
    I have reported your post

  7. #7
    Thailand Expat Pragmatic's Avatar
    Join Date
    Mar 2013
    Last Online
    @
    Location
    Last but who gives a shit.
    Posts
    13,362
    ^ Doc it's called a 'cold seal' joint. The same as used when constructing a swimming pool.

  8. #8
    Thailand Expat
    DrAndy's Avatar
    Join Date
    Nov 2005
    Last Online
    25-03-2014 @ 05:29 PM
    Location
    yes
    Posts
    32,025
    Yes, I know the technical term but judging from the question, that would mean nothing without some additional description

  9. #9
    Thailand Expat Pragmatic's Avatar
    Join Date
    Mar 2013
    Last Online
    @
    Location
    Last but who gives a shit.
    Posts
    13,362
    Quote Originally Posted by DrAndy
    Yes, I know the technical term
    Of course you do. You're DrAndy. The man that's never wrong.

  10. #10
    Thailand Expat Fondles's Avatar
    Join Date
    Aug 2007
    Last Online
    @
    Location
    Chonburi, Thailand
    Posts
    7,878
    I would pour the floor first then user waterstops in the joints.

  11. #11
    Banned

    Join Date
    Jul 2012
    Last Online
    09-05-2021 @ 03:25 AM
    Posts
    33,644
    Do the ceilings first

  12. #12
    Newbie

    Join Date
    Sep 2013
    Last Online
    09-09-2013 @ 10:32 AM
    Posts
    7
    Quote Originally Posted by jonny22 View Post
    Everyone has his own query about that but I think it will work either way. What does your contractor recommend you about it ? You should consult some professional rather than searching it on google.
    Also visit.
    Architect Gold Coast

  13. #13
    ความสุขในอีสาน
    nigelandjan's Avatar
    Join Date
    Jan 2009
    Last Online
    @
    Location
    Frinton on sea and Ban Pak
    Posts
    13,336
    I would take the advice of the Dutch guy Koet above , he does know what he,s talking about

  14. #14
    Newbie

    Join Date
    Sep 2013
    Last Online
    14-09-2013 @ 11:28 AM
    Posts
    9
    Quote Originally Posted by jonny22 View Post
    Everyone has his own query about that but I think it will work either way. What does your contractor recommend you about it ? You should consult some professional rather than searching it on google.
    I agree with Jonny, every one has his on the query, the best way is to consult with a good builder nearby you.

  15. #15
    Newbie

    Join Date
    Sep 2013
    Last Online
    14-09-2013 @ 11:28 AM
    Posts
    9
    Quote Originally Posted by Brice View Post
    Quote Originally Posted by jonny22 View Post
    Everyone has his own query about that but I think it will work either way. What does your contractor recommend you about it ? You should consult some professional rather than searching it on google.
    I agree with Jonny, every one has his on the query, the best way is to consult with a good builder nearby you.
    house builders Brisbane

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •