I would like to get some opinions and advice on this.
I have always read where you pour the reinforced concret floor first for a pond and then build up the walls. Lately I have read where sometimes they build the walls first and then pour the floor.
For information I build with breeze blocks, filled with waterproof concret and then render the walls.
For the floor I use rebar and concret mixed on site. Then I paint walls and floor with two or more coats of a good leak proof paint.
I would like to know how they seal between wall and floor and to be able to post the two different articles I found using goggle, but, I can't find them again.
All coments and advise welcone. Thanks.