View Single Post
Old 22-02-2008, 05:11 PM   #14 (permalink)
dirtydog
The Dog
 
dirtydog's Avatar
 
Last Online: Today 01:33 PM
Join Date: Jun 2005
Location: Pattaya
Posts: 35,303
dirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the net
Donor
Well after slight modification of the cap and pipe we end up with this.



Next fun job is raising the floor height, so first we have to find the true level, the floor variation is upto 8 cms, ie loads of dips and rises don't forget this sand and cement all has to taken to the lift and then brought up to the condo so it is pretty hard work, the mounds are for us to have a height to work to for the pouring.



__________________

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.




To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
dirtydog is online now   Reply With Quote
 
Page generated in 0.07410 seconds with 19 queries