View Single Post
Old 07-01-2017, 08:50 AM   #9 (permalink)
Pragmatic
Thailand Expat
 
Pragmatic's Avatar
 
Last Online: Today 09:45 PM
Join Date: Mar 2013
Location: Last but who gives a shit.
Posts: 7,927
Pragmatic has disabled reputation
Surely the top would be constructed of reinforced concrete prior to tiling. That then would need to be left to season before the forming can be removed. Causing a delay in the build.
That's how mine were built. Sorry no photo's, me camera's gone a bollix.

PS. My toilet/shower room cupboards were built in the same way. Each builder has their own methods.
Pragmatic is offline   Reply With Quote
 
Page generated in 0.07523 seconds with 19 queries