View Single Post
Old 19-12-2016, 02:33 PM   #110 (permalink)
jonnyenglish
Member
 
Last Online: Today 10:59 AM
Join Date: Jun 2016
Posts: 126
jonnyenglish is a name known to all Thailand Expatsjonnyenglish is a name known to all Thailand Expatsjonnyenglish is a name known to all Thailand Expatsjonnyenglish is a name known to all Thailand Expatsjonnyenglish is a name known to all Thailand Expatsjonnyenglish is a name known to all Thailand Expatsjonnyenglish is a name known to all Thailand Expatsjonnyenglish is a name known to all Thailand Expatsjonnyenglish is a name known to all Thailand Expatsjonnyenglish is a name known to all Thailand Expatsjonnyenglish is a name known to all Thailand Expatsjonnyenglish is a name known to all Thailand Expatsjonnyenglish is a name known to all Thailand Expatsjonnyenglish is a name known to all Thailand Expats
Not much going on with the build today, but over the past few days, more wire meshing (square stuff laid flat for strengthening floors) and rebar and shuttering was put in, plus the precast concrete slabs arrived and were placed.






Above nearest to camera is the front covered walkway/veranda/porch that runs the length of the house and is set 12cms lower than the main floor level (where second line of metal form is placed), more than enough space for chairs and a table for G&T's.
jonnyenglish is online now   Reply With Quote
 
Page generated in 0.06674 seconds with 19 queries