The 1 meter retaining wall has been completed to contain the fill dirt and red brick filler continues around the house.
The steel for the back patio is being cut and welded. The little lady keeps a watchful eye on things while her Thai kitchen gets more red brick at the back of the house. There will be a door on each side of the kitchen, one leading down to a wash area and on the other side toward the pool table and entertainment area. I am dreading the trip to the roofing company to order the steel roof panels since there must be well over 600m2 to cover. I will give you an exact fugure once all the measurements are made. The roof will be the most expensive part of this build, but I think it is a part of the house that needs the most effort along with the foundation.
Another angle of the red brick and back patio steel.