Quote:
|
Originally Posted by surasak How do the concrete precasts tie into the supports? |
They are just layed, then a rebar grid is made on top of that, then the pour is done, the pour generally is about 7cms thick which really isn't thick enough to avoid flexing, but with a general height variation of about 5 cms plus the 2cms needed for tiling that adds a bit more onto the thickness.