Quote:
Originally Posted by lom Quote:
Originally Posted by wanna hi DD
the land does not have chanote title so it does not require submission for approval Quote:
Originally Posted by dirtydog You can't build till you have plans to submit for planning permission, these plans have the basic specs on them. | | AFAIK you need to have an architectural and structural plan approved by your Tessaban in order to register the house.
No post address, no house book, no electricity (except for construction power/meter)
if the house in not registered. |
hi lom
yes i have that part sorted out already
thanks