View Single Post
Old 14-05-2006, 07:18 PM   #31 (permalink)
dirtydog
The Dog
 
dirtydog's Avatar
 
Last Online: Today 01:25 PM
Join Date: Jun 2005
Location: Pattaya
Posts: 35,218
dirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the netdirtydog User spends way too much time on the net
Donor
As you can see in this picture they have used precast concrete beams for the floor or ceiling depending which way you look at it, these are about 5cms thick, you can see in this picture that they are supported with wood to stop them sagging or them breaking when they do the concrete pour on top of it, alas they always sag and if it is the roof area this is where water will saty due to the sagging in the middle.






Anyway I had a quick climb up their makeshift ladder today risking life and limb to see if they had done the pour on the second floor, and yep, here it is





On this block of shop houses they are still doing the beamwork for the second floor.






The original block they are now doing the beamwork on the 3rd floor, things are zooming along at a nice pace


__________________

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.




To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
dirtydog is online now   Reply With Quote
 
Page generated in 0.08192 seconds with 19 queries