As you can see in this picture they have used precast concrete beams for the floor or ceiling depending which way you look at it, these are about 5cms thick, you can see in this picture that they are supported with wood to stop them sagging or them breaking when they do the concrete pour on top of it, alas they always sag and if it is the roof area this is where water will saty due to the sagging in the middle.
Anyway I had a quick climb up their makeshift ladder today risking life and limb to see if they had done the pour on the second floor, and yep, here it is
On this block of shop houses they are still doing the beamwork for the second floor.
The original block they are now doing the beamwork on the 3rd floor, things are zooming along at a nice pace
